Chapter 3: Installing the Hardware
86
5. Verify that the handle on the SFP+ transceiver is in the upright
position, as shown in Figure 49, to prevent inadvertently removing the
transceiver.
Figure 49. Positioning the SFP+ Transceiver Locking Handle
6. Remove the dust plug from the SFP+ transceiver, as shown in
Figure 50.
Figure 50. Removing the Dust Plug from an SFP+ Transceiver
7. Connect a cable to the SFP+ transceiver, as shown in Figure 51. For
SFP+ optical and cabling specifications, consult the documentation
shipped with the module.
RP
S
READY
S
TACKIN
G
r
isk of
r
vici
n
g
AT-LX44CPUCVR
AT-x6EM
/X
S
2
1
2
L/A
L/A
POWER
S
FP+
S
FP+
CLASS 1
LASER P
RODUCT
10G LINK
ACT
L/A
RP
S
READY
S
TACKIN
G
r
isk of
r
vici
n
g
AT-LX44
CPUCVR
AT-x6EM/X
S
2
1
2
L/A
L/A
POWER
S
FP+
S
FP+
CLASS 1
LASER P
RODUCT
10G LINK
ACT
L/A
Summary of Contents for 48Ts/X
Page 8: ...Contents 8...
Page 12: ...Tables 12...