Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the tumbler before servicing.
• Close gas shut-off valve to gas tumbler before servicing.
• Close steam valve to steam tumbler before servicing.
• Never start the tumbler with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the tumbler is properly grounded.
W002
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
67. CONTACTORS AND TERMINAL BLOCK
(Electric Models)
Refer to Figure 25.
NOTE: Contactors and terminal blocks are located
in contactor box at the rear of the tumbler.
a. Remove screw holding cover to contactor box
and remove cover.
b. Remove wires from contactor terminals and
terminal blocks.
NOTE: Refer to wiring diagram when rewiring
contactors or terminal blocks.
c. Remove screws attaching contactor to box.
d. Remove two screws holding terminal block to
NOTE: Terminal block consists of two terminal
section (one phase) or three terminal sections (three
phase) and an end piece snapped together.
NOTE: Terminal blocks and contactors on units
manufactured after September 1, 1994 are din rail
mounted. Terminal block is one piece. Refer to
Figure 26.
Figure 25
T022SE1A
ATTACHING
SCREWS
CONTACTOR
CONTACTOR
TERMINAL
BLOCK
Figure 26
T276PE1A
TERMINAL
BLOCK
(Used on 380-415V,
50 Hz, 3 Ph
Tumblers Only)
TERMINAL
BLOCK
DIN RAIL
SCREW
(2)