
SECTION 2
OPERATIONS
064633
Page 32
Before starting the air powered screed, there are a few items that need to be looked over.
• Make sure that bolts are secure and will not vibrate loose.
• Check jam nuts on top pipe to ensure that they are tight against the top pipe coupler.
• Check the hydraulic level in the tank for the hydraulic winches (if applicable).
• Check winch cables to make sure that they will not loosen during the screed run.
• Look over the forms to check for unevenness so that the screed will not hang up.
Ask yourselves these questions when preparing your screed for a job.
• What is the “exact” pour width?
• What is the slump?
•
Is the slab flat, crowned, or inverted?
• What is the required surface tolerance?
• Choose screed type and size based on the above information.
• Are any accessories required?
• Do the winches work properly?
Pre-Operation Instructions
Summary of Contents for SE12
Page 17: ...SECTION 1 SAFETY 064633 Page 17 SECTION 1 SAFETY ...
Page 18: ...SECTION 1 SAFETY 064633 Page 18 State Regulations Proposition 65 Warning ...
Page 19: ...SECTION 1 SAFETY 064633 Page 19 Federal Regulation Respiratory Hazard ...
Page 30: ...SECTION 1 SAFETY 064633 Page 30 Notes ...
Page 31: ...SECTION 2 OPERATIONS 064633 Page 31 SECTION 2 OPERATIONS ...
Page 41: ...SECTION 3 SERVICE 064633 Page 41 SECTION 3 SERVICE ...
Page 45: ...SECTION 4 PARTS 064633 Page 45 SECTION 4 Parts ...
Page 72: ...SECTION 4 PARTS 064633 Page 72 4 13 End Mount Engine Assembly Illustration ...