Introduction to MSP475
This machine is built with user safety in mind. However, it can present hazards if
improperly operated and serviced. Follow operating instructions carefully.
If you have any questions about operating or servicing this equipment, please
contact your Allen Engineering Dealer or AEC Customer Service at 800-643-0095
or 870-236-7751.
The MSP475 riding trowel is a modern high production machine. Finishing rate will vary depending on the operators skill
and job conditions. This riding trowel has ten finishing blades.
The Super Heavy Duty (SHD) Gearboxes are designed to provide exceptional performance with low maintenance and
trouble free use under some of the worst conditions.
All Allen Engineering MSP465 Riders are equipped with a safety shutdown switch and a low oil warning for added job
safety and engine protection. Operating time between fuel refills is approximately 2-1/2 to 3 hours depending on rotor
speeds.
SECTION 2
OPERATIONS
069583
Page 28
Summary of Contents for MSP475
Page 6: ...069583 Page 6 GENERAL INFORMATION CE Declaration ...
Page 12: ...Dimensions mm in 069583 Page 12 GENERAL INFORMATION Engine Specifications ...
Page 14: ...SECTION 1 SAFETY SECTION 1 SAFETY 069583 Page 14 ...
Page 27: ...SECTION 2 OPERATION SECTION 2 OPERATIONS 069583 Page 27 ...
Page 39: ...SECTION 3 SERVICE 069583 Page 39 SECTION 3 SERVICE ...
Page 50: ...SECTION 4 ACCESSORIES SECTION 4 ACCESSORIES 069583 Page 50 ...