the desired grade slope. It is recommended that the crown bolts
be adjusted 1/2 inch at a time and alternated sequentially. This
permits the crown bolt nuts to shift slightly to compensate for the
angle change and requires less adjustment effort. Lock nuts “B”
must be backed off at the same time that you adjust the crown
nuts ”A”.
14. CHAIN TENSION
- Use the chain tightener on the paving car-
riage to equalize the tension of each carriage travel chain (See
Figure 28). Be careful to verify that the carriage is “square” with
the carriage rails. For dual chain machines, run the carriage to the
drive end of the machine and verify that the distance between the
carriage frame and the carriage travel shaft (Dimension “A” & “B”
) is the same at each chain. Adjust the side thrust rollers to keep
the carriage square.
SECTION 2
OPERATIONS
050362
Page 38
2.5 - Machine Setup, continued
Summary of Contents for BDF4836B
Page 5: ...050362 Page 5 Table of Contents continued ...
Page 14: ...050362 Page 14 Notes ...
Page 15: ...SECTION 1 SAFETY 050362 Page 15 SECTION 1 SAFETY ...
Page 21: ...SECTION 1 SAFETY 050362 Page 21 PAGE LEFT BLANK INTENTIONALLY ...
Page 22: ...Notes SECTION 1 SAFETY 050362 Page 22 ...
Page 23: ...SECTION 2 OPERATIONS 050362 Page 23 SECTION 2 OPERATIONS ...
Page 40: ...Power Crown Lever Nut A SECTION 2 OPERATIONS 050362 Page 40 2 6 Power Crown Option ...
Page 46: ...Skew Clamp Skew Cylinder SECTION 2 OPERATIONS 050362 Page 46 2 7 Paving Operations continued ...
Page 49: ...SECTION 2 OPERATIONS 050362 Page 49 PAGE LEFT BLANK INTENTIONALLY ...
Page 50: ...SECTION 2 OPERATIONS 050362 Page 50 Notes ...
Page 51: ...SECTION 3 SERVICE 050362 Page 51 SECTION 3 SERVICE ...