Lifting Procedures
ALWAYS DO A THOROUGH INSPECTION OF THE SLINGS, CHAINS, AND HOOKS
BEFORE ATTEMPTING TO LIFT THE MACHINE!
OSHA has set forth guidelines which detail the use of Rigging Equipment for Material
handling. This guideline is found under
OSHA Standard Number: 1926.251
Please read and follow all guidelines found in this standard.
Removal from service.
Synthetic web slings shall be
immediately removed from
service if any of the following
conditions are present
:
OSHA 1926.251(e)(8)
SECTION 3
SERVICE
069583
Page 53
Summary of Contents for 070080
Page 9: ...Machine Dimensions 50 56 in 46 59 in 97 18 in 069583 Page 9 GENERAL INFORMATION ...
Page 13: ...Section 1 SAFETY SECTION 1 SAFETY 069583 Page 13 ...
Page 26: ...Section 2 OPERATIONS SECTION 2 OPERATIONS 069583 Page 26 ...
Page 28: ...Start up Procedures SECTION 2 OPERATIONS 069583 Page 28 ...
Page 35: ...Section 3 SERVICE 069583 Page 35 ...
Page 59: ...Popular Accessories SECTION 4 ACCESSORIES 069583 Page 59 ...