Putting into operation
R&S
®
NGL200/NGM200
17
Getting Started 1178.8720.02 ─ 07
Delivery package
The package contents contain the following items:
●
R&S NGL power supply or R&S NGM power supply
●
Four power cables
●
One printed Getting Started manual
●
One document folder containing a printed Basic Safety Instructions guide
5.4
Setting up the instrument
The R&S
NGL/NGM is designed for benchtop and rackmount operation.
5.4.1
Bench operation
On a benchtop, the R&S
NGL/NGM power supply can either lie flat or stand on its
feet. As shown in
, feet on the bottom can be folded out to set the
instrument in an inclined position.
Figure 5-1: Operating positions
Positioning of instrument
The instrument must be positioned in a manner that allows you to discon-
nect the unit from the mains at any time and without restrictions.
Setting up the instrument
www.allice.de
Allice Messtechnik GmbH