Operation
Algas-SDI Operation and Maintenance Manual – P/N – 54000
3-14
Direct Fired Vaporizer shut down procedure
(See Figure 7)
1. Turn temperature control dial to “OFF” position. Pilot flame should
immediately extinguish.
2. Once the pilot flame has extinguished turn the igniter switch to “OFF.
3. Close the isolation valve ahead of the burner regulator on the side of the
vaporizer. This will prevent any fuel from going downstream to the
thermostat, pilot and main burner.
Figure 7
–
Vaporizer shut down procedure
Direct Fired Vaporizer purge procedure
If the vaporizer is not going to be used for a long period of time, it should
be purged. The information contained below is a step by step procedure on
how to purge Algas-SDI direct fired vaporizer. This procedure should be
followed anytime a vaporizer needs to be maintained, serviced, relocated
or shut down for any other reason.
WARNING
Prior to purging the vaporizer, ensure that there are no closed ball
valves or back check valves restricting the flow of liquid to the tank.
Isolation valve
Thermostat
Regulator
Summary of Contents for 160H
Page 4: ...This page left intentionally blank...
Page 6: ...This page left intentionally blank...
Page 9: ...This page left intentionally blank...
Page 42: ...Algas SDI Operation and Maintenance Manual P N 54000 5 32 APPENDIX A TECHNICAL INFORMATION...
Page 43: ...Figure 11 160H Vaporizer Replacement Parts 3 11 13 5 6 1 2 7 4 14 10 12 8 9...
Page 57: ......