SINGLE/DOUBLE STORAGE MODULE & SINGLE/DOUBLE SINK MODULE ASSEMBLY INSTRUCTIONS
|
3
Essential TIP:
Ensure you have a stable flat surface or
workbench to work from. The most ideal height to assemble
the module is waist height. The workbench should be at least
1.8m (W) x 1m(H) x 0.7m(D) in size.
Remove all parts from the cartons. DO NOT
unwrap the frames at this stage.
Preparing the panels:
• Remove all the white panels from
the carton and place in an easily
accessible location (All red arrow labels
to face upwards).
• Remove at least 10cm of plastic film
alongside the edge of the panels, as per
image.
Essential TIP:
DO NOT remove all the
plastic film from the panels, since the 4
way red arrows are an integral part of the
assembly process.
The red arrow stickers are placed on top of
the plastic on most panels and therefore the
plastic should not completely be removed
at this stage.
WHAT TO DO NEXT?