background image

Stone Top Installation

Gluing of Stone Tops

Starting with stone pieces A&B place pieces one by one on HN12502BQ allowing

20mm past the front of the carcass. Using neutral cure clear silicone apply 10mm

diameter dollops and apply pressure to tops

Apply stone piece C to side of HN1110DWF sitting on Stone piece A (silicone off)

Apply stone piece D to side of HN11102D sitting on stone piece B (silicone off)

Ensure alignment of stone pieces A-D

Apply stone piece E to side of HN1110DWF ensuring that top of stone is flush with

top of joinery unit (silicone off)

Apply stone piece F to side of HN11102D ensuring that top of stone is flush with top

of joinery unit (silicone off)

Apply stone piece G to top of HN1110DWF ensuring alignment with stone piece E&C

(silicone off)

Apply stone piece H to top of HN11102D ensuring alignment with stone piece D&F

(silicone off)

Summary of Contents for KAKADU 2

Page 1: ...KAKADU 2 Assembly Instructions ...

Page 2: ......

Page 3: ...1102D Sink Unit Cabinet Door Boxes 1 x HN1110DWF Kicker Infills 1 x HN12502BQ Door Kicker 1 x HN11102D Door Kicker Stone Tops 8 pieces A H Appliances Accessories 1 x EA900WFSX Beverage Cooler 1 x HN1200RBQ 6 Burner BBQ Hooded 1 x EMJG30WSX Domino Wok Burner 1 x ES510UM Undermount Sink 1 x PC1001SB Sink Mixer ...

Page 4: ......

Page 5: ...Carcass Assembly Assemble Fridge Unit Cabinet HN1110DWF as per assembly instructions provided using hardware supplied ...

Page 6: ...Carcass Assembly Assemble BBQ Unit Carcass HN12502BQ as per assembly instructions provided using hardware supplied ...

Page 7: ...Carcass Assembly Assemble Sink Unit Carcass HN11102D as per assembly instructions provided using hardware supplied ...

Page 8: ...cass Installation Floor Check Using a spirit level 1200mm min check the floor where you are planning to install the carcass units Mark with a pencil indicating the highest and lowest sections of the floor ...

Page 9: ... Installation Wall layout Refer to the KAKADU 2 kitchen layout pg 2 and mark the cabinetry unit widths and heights making allowance for 20mm thickness of stone The finished joinery height recommended is 950mm ...

Page 10: ...ng approx 100mm void from the back of the unit to the wall for services void drill through service point as required Once in place screw together both units using 28mm 8g wood screws x4 Place HN11102D unit in desired position and level off to the recommended height using adjustable legs allowing approx 100mm void from the back of the unit to the wall for services void drill through service point a...

Page 11: ...pply stone piece D to side of HN11102D sitting on stone piece B silicone off Ensure alignment of stone pieces A D Apply stone piece E to side of HN1110DWF ensuring that top of stone is flush with top of joinery unit silicone off Apply stone piece F to side of HN11102D ensuring that top of stone is flush with top of joinery unit silicone off Apply stone piece G to top of HN1110DWF ensuring alignmen...

Page 12: ...ated on the carcass sides Repeat the above steps for door pack HN11102D Infill Placement Attach infill pieces from door pack HN1110DWF with neutral cure clear silicone and press in position Kicker Placement Starting with HN1110DWF kicker apply neutral cure silicon to leg bases and blocks and press in position Align HN12502BQ kickers and HN11102D kickers and repeat the above steps ...

Page 13: ...BQ Unpack and place HN1200RBQ 6 Burner BBQ Hooded on to HN12502BQ ready for installation by qualified gas fitter WOK Unpack and place EMJG30WSX Domino Wok Burner on to HN11102D ready for installation by qualified gas fitter Sink Tap Unpack and place ES510UM Undermount Sink and PC1001SB Sink Mixer into HN11102D ready for installation by qualified plumber ...

Reviews: