Stone Top Installation
Gluing of Stone Tops
Starting with stone pieces A&B place pieces one by one on HN12502BQ allowing
20mm past the front of the carcass. Using neutral cure clear silicone apply 10mm
diameter dollops and apply pressure to tops
Apply stone piece C to side of HN1110DWF sitting on Stone piece A (silicone off)
Apply stone piece D to side of HN11102D sitting on stone piece B (silicone off)
Ensure alignment of stone pieces A-D
Apply stone piece E to side of HN1110DWF ensuring that top of stone is flush with
top of joinery unit (silicone off)
Apply stone piece F to side of HN11102D ensuring that top of stone is flush with top
of joinery unit (silicone off)
Apply stone piece G to top of HN1110DWF ensuring alignment with stone piece E&C
(silicone off)
Apply stone piece H to top of HN11102D ensuring alignment with stone piece D&F
(silicone off)