3 Installation
This instruction manual is part of the delivery. Study the instructions carefully.
The items refer to the parts list and service kits section.
The valve is supplied as separate parts as standard (for welding).
The valve is assembled before delivery, if it is supplied with fittings.
2d
Change-over valve - Reverse Acting:
1. Complete actuator.
2. Bonnet (20).
3. 4 x clamps (19).
4. Upper valve plug (34).
5. Lower valve plug (35).
6. 3 x upper valve bodies (26).
7. 2 x valve seats (28).
8. Lower bonnet (33).
UP
TD 461-022_1
Step 3
Remove possible packing materials from the valve/valve parts.
Inspect the valve/valve parts for visible transport damage.
Avoid damaging the valve/valve parts.
9
Summary of Contents for Unique SSV PN10
Page 2: ......
Page 32: ... 32 ...