
Maintenance and Repair
(continued)
Gear Subassembly
3. Insert 1st stage Worm wheel (pos. 14) and Horizontal shaft (pos. 29). Mount Washer (pos. 18),
Spring washer (pos. 16) and fix with Screw (pos. 17). Check rotation.
4. Insert Turbine shaft (pos. 7). Mount Washer (pos. 18), Spring washer (pos. 16) and fix with Screw
(pos. 17). Use faces on Turbine shaft to hold against rotation when tightening screw.
5. Hold Turbine shaft (pos. 7) against 1st stage Worm wheel and tighten Screws (pos. 17) in
Horizontal shaft (pos. 29) and Pinion (pos. 11). Check rotation on Turbine shaft.
www.sks-online.com
www.sks-webshop.com
Summary of Contents for Toftejorg TZ-79
Page 2: ...www sks online com www sks webshop com...
Page 4: ...www sks online com www sks webshop com...
Page 11: ...Technical data continued Flow rate www sks online com www sks webshop com...
Page 23: ...Maintenance and Repair continued Top Assembly www sks online com www sks webshop com...
Page 25: ...Maintenance and Repair continued Bottom Assembly www sks online com www sks webshop com...
Page 27: ...Maintenance and Repair continued Hub Assembly www sks online com www sks webshop com...
Page 29: ...Maintenance and Repair continued Stem Subassembly www sks online com www sks webshop com...
Page 43: ...Cross Sectional Drawing www sks online com www sks webshop com...
Page 47: ...EC Declaration of conformity www sks online com www sks webshop com...