
Maintenance and Repair
(continued)
Preventive Maintenance
5.
Check Worm wheels (pos. 13 and pos. 14). If extremely worn, they should be replaced.
6.
Check Main bush (pos. 6). If worn oval to max. diameter more than 15.4 mm, it should be
replaced.
7.
Assemble machines as described in the following pages.
8.
Check that the machine is in operating condition by inserting hex Screwdriver (tool No. TE134A) in
screw in top of Turbine shaft and easily turn Turbine shaft clockwise. If any resistance is
recognized, the machine should be disassembled to localize the cause.
Apart from the parts specifically mentioned above, all the remaining wear parts should regularly be
inspected for wear. Which parts that are wear parts appear from Reference List of Parts, page 40.
www.sks-online.com
www.sks-webshop.com
Summary of Contents for Toftejorg TZ-79
Page 2: ...www sks online com www sks webshop com...
Page 4: ...www sks online com www sks webshop com...
Page 11: ...Technical data continued Flow rate www sks online com www sks webshop com...
Page 23: ...Maintenance and Repair continued Top Assembly www sks online com www sks webshop com...
Page 25: ...Maintenance and Repair continued Bottom Assembly www sks online com www sks webshop com...
Page 27: ...Maintenance and Repair continued Hub Assembly www sks online com www sks webshop com...
Page 29: ...Maintenance and Repair continued Stem Subassembly www sks online com www sks webshop com...
Page 43: ...Cross Sectional Drawing www sks online com www sks webshop com...
Page 47: ...EC Declaration of conformity www sks online com www sks webshop com...