Alfa Laval Pharma-line 1 Instruction Manual Download Page 12

How to contact Alfa Laval
Contact details for all countries are
continually updated on our website.
Please visit www.alfalaval.com to access the information directly.

© Alfa Laval Corporate AB

This document and its contents is owned by Alfa Laval Corporate AB and protected by laws governing intellectual property and thereto related rights. It is the responsibility of the user of this
document to comply with all applicable intellectual property laws. Without limiting any rights related to this document, no part of this document may be copied, reproduced or transmitted in any

form or by any means (electronic, mechanical, photocopying, recording, or otherwise), or for any purpose, without the expressed permission of Alfa Laval Corporate AB. Alfa Laval Corporate AB

will enforce its rights related to this document to the fullest extent of the law, including the seeking of criminal prosecution.

www.sks-online.com 

www.sks-webshop.com 

Summary of Contents for Pharma-line 1

Page 1: ...Instruction Manual Pharma line ESE02198 EN 2012 05 Original manual www sks online com www sks webshop com...

Page 2: ...www sks online com www sks webshop com...

Page 3: ...tling 6 2 2 Foundations 6 2 3 Levelling 6 2 4 Cleanliness provisions 6 2 5 Fittings and piping 6 3 Operation 7 3 1 Design and operating conditions 7 3 2 Operating procedures 7 4 Maintenance 8 4 1 Insp...

Page 4: ...ant Metal should be sent for material recycling Maintenance All metal parts should be sent for material recycling All non metal parts must be taken care of in agreement with local regulations Scrappin...

Page 5: ...irst tube sheet and the second tube sheet seals the product In the event of a leak the leakage of either fluid is easily visually detected 5300 0000 A A Tube sheets Documentation The Pharma line is de...

Page 6: ...directions on shell side are max 100 N 2 4 Cleanliness provisions Connector protectors All exchanger openings should be inspected for foreign material Protective plugs should not be removed until just...

Page 7: ...troduced in a manner to minimize differential expansion between the shell and the tubes Note Adjustments of flow rates should be made slowly in order to avoid the risk of pressure surge water hammer W...

Page 8: ...em accessible for cleaning remove the front head read end cover Always replace the Seal when the front cover is loosened to make sure that the Seal seals correctly 4 4 Locating leaks The heat exchange...

Page 9: ...s Tri clamp on tube side and flanges on service side other options available Pressure vessel codes PED and ASME VIII U stamp as option Welding according to ASME IX and EN 288 3 EN 287 1 Surface finish...

Page 10: ...harma line 2 2 6 168 2200 220 1860 Pharma line 2 5 5 219 2200 253 1860 Pharma line 3 Pharma line 3 0 4 73 3200 180 2860 Pharma line 3 1 0 89 3200 190 2860 Pharma line 3 1 6 12 3200 190 2860 Pharma lin...

Page 11: ...11 www sks online com www sks webshop com...

Page 12: ...of the user of this document to comply with all applicable intellectual property laws Without limiting any rights related to this document no part of this document may be copied reproduced or transmi...

Reviews: