5 Maintenance
Maintain the pump with care. Read the instructions carefully and pay special attention to the warnings!
Always keep spare shaft seals and rubber seals in stock.
See separate motor instructions.
Check the pump for smooth operation after service.
Shaft seal
Rubber seals
Motor bearings
Preventive maintenance
Replace after 12 months:
(one-shift) Complete shaft seal
Replace when replacing the
shaft seal
Maintenance after leakage
(leakage normally starts slowly)
Replace at the end of the
day: Complete shaft seal
Replace when replacing the
shaft seal
Planned maintenance
-
Regular inspection for
leakage and smooth
operation
-
Keep a record of the pump
-
Use the statistics for
inspection planning
Replace after leakage:
Complete shaft seal
Replace when replacing the
shaft seal
Yearly inspection is
recommended
-
Replace complete bearing
if worn
-
Ensure that the bearing is
axially locked (See motor
instructions)
Lubrication
Before fitting
Lubricate the O-rings with
silicone grease or silicone oil
Before fitting
Silicone grease or silicone oil
See section 6.2 Relubrication
intervals
Pre-use check
CAUTION!
Fit the electrical connections correctly if they have been removed from the motor during servicing.
(See pre-use check in section 3 Installation).
Pay special attention to warnings!
1. Start and stop the motor momentarily
2. Ensure that the pump operates smoothly.
19
Summary of Contents for LKH
Page 1: ...3000 0059 ESE00698 EN21 2017 05 Original manual Instruction Manual LKH Centrifugal Pump...
Page 2: ......
Page 45: ...45...
Page 54: ...54...
Page 55: ...55...