![Alfa Laval LKH Prime 20 Instruction Manual Download Page 7](http://html1.mh-extra.com/html/alfa-laval/lkh-prime-20/lkh-prime-20_instruction-manual_2895173007.webp)
3 Installation
Read the instructions carefully and pay special attention to the warnings! Always check the pump before operation.
-See pre-use check in section 3.3 Pre-use check
The pump is heavy.
Alfa Laval therefore recommends the use of a lifting crane when handling the pump.
3.1
Unpacking/delivery
Step 1
Always use a lifting crane when handling the pump (see technical
data).
CAUTION
Alfa Laval cannot be held responsible for incorrect unpacking.
WARNING:
Be aware that certain pump configurations can tilt, and therefore
cause injuries to feet or fingers. The pump should be supported
underneath the adaptor, when not installed in the process line.
Check the delivery for:
1. Complete pump.
2. Delivery note.
3. Motor instructions.
Step 2
Remove any packing materials from the inlet and the outlet.
Avoid damaging the inlet and the outlet.
Avoid damaging the connections for flushing liquid, if supplied.
Remove
packing
materials!
Step 3
Inspect the pump for visible transport damage.
Inspection!
Step 4
Always remove the shroud, if fitted, before lifting the pump.
Remove the shroud before lifting!
7
www.sks-online.com
www.sks-webshop.com