background image

Lever-Operated Grease Gun

SER 1056-S4

Alemite LLC

5

Revision (11-10)

  6. Operate the pump and view the movement of the 

Follower Rod.

  7. Discontinue pump operation once the groove* on the 

Follower Rod is visible.

  8. Push and turn the Follower Rod into the Cylinder.

  9. Prime the gun. Refer to the section entitled 

Priming 

the Loaded Gun

 for details.

Suction Loading

  1. Unscrew the Head Assembly from the Cylinder.

  2. Insert the head of the Cylinder below the surface of the 

grease.

  3. Slowly pull the Follower Rod outward from the 

Cylinder Cap until the groove* is visible.

  4. Engage the groove in the Follower Rod with the slot in 

the Cylinder’s Cap. See 

Figure 3

.

  5. Screw the Head Assembly onto the Cylinder.

• Tighten the Head Assembly securely.

  6. Push and rotate the Follower Rod into the Cylinder.

  7. Prime the gun. Refer to the section entitled 

Priming 

the Loaded Gun

 for details.

Priming the Loaded Gun

Overview

Priming is the act of removing air and introducing 

grease into the gun’s pumping mechanism.

Whether a gun primes is dependent on the:

• viscosity of the grease
• temperature of the grease
• condition of the gun

Operate the Gun

IMPORTANT: Make sure the gun is in the
volume position. See Figure 7.

In most cases the gun will prime simply by operating 

the Lever several times. 

Should grease fail to appear, the Head Assembly must 

be bled.

* Locate the second groove on model 1056-LE4.

Figure 6

Loader Fitting and Loader Coupler 

Section View

Figure 5

Follower Rod Engaged with Back-Up Plate

1-800-548-1191 - http://www.partdeal.com - [email protected]

Reviews: