background image

- 4 - 

89.4

"

35.43

"

28.75"

Reflector

Glass Tube

Flame Screen

Protective Guard

Upper Support

Front Panel

Side Panel

Lower Support

Bottom plate

Parts List

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents 
list and hardware contents above. If any part is missing or damaged, do not attempt to assemble the product. 
Contact customer service for replacement parts.
Estimated Assembly Time: 60 minutes
Tools Required for Assembly (not included):
Phillips screwdriver w/ medium blade. Leak Detection Solution.

PREPARATION

PARTS AND SPECIFICATIONS

18

"

Summary of Contents for PYRAMID SQUARE

Page 1: ...Keep this manual for f As 87IN He ITE ANSI 83 26 2014 CSA 2 37 2014 5016039 PATIO HEATER MODEL PYRAMID SQUARE Owner s Manual ...

Page 2: ......

Page 3: ...y persons who can understand and follow the instructions should use or service this heater EXPLOSION FIRE HAZARD Keep solid combustibles such as building materials paper or cardboard a safe distance away from the heater as recommended by the instructions Provide adequate clearances around air openings into the combustion chamber Never use the heater in spaces which do or may contain volatile or ai...

Page 4: ...a immediately Never install or remove the propane cylinder This heater is red hot during use and can ignite flammables that are too close to the burner Keep flammables at least 3 feet from sides 3 feet from top Keep gasoline and other flammable liquids and vapors well away from heater Store the propane cylinder outdoors in a well ventilated space out of reach of children Never store the propane cy...

Page 5: ... or protective device removed for servicing the appliance prior to placing back in service Installation and repair should be done by a qualified service person The heater should be inspected before use and annually by a qualified service person More frequent cleaning may be required as necessary It is imperative that the control compartment burners and circulating air passageway of the appliance b...

Page 6: ...re all parts are present Compare parts with package contents list and hardware contents above If any part is missing or damaged do not attempt to assemble the product Contact customer service for replacement parts Estimated Assembly Time 60 minutes Tools Required for Assembly not included Phillips screwdriver w medium blade Leak Detection Solution PREPARATION PARTS AND SPECIFICATIONS 18 ...

Page 7: ...ector 1 B Flame Screen 1 C Glass Tube 1 D Upper Support 4 E Protective Guard 4 F Black Silicone Ring 1 G Side Panel 3 H Front Panel 1 I Gas Hose 1 J Control Box Assy 1 K Lower Support 4 L Block Belt 4 M Wheel Assembly 1 N Bottom Plate 1 AA BB Wing nut Qty 3 Small flat washer Qty DD EE JJ Qty 24 CC Stud Qty 3 Philips Qty 1 Qty 4 FF II Qty 4 Qty 1 HH Flange nut Qty 4 KK Knob Qty 1 MM LL Qty 1 Chain ...

Page 8: ...ttom plate Fix the wheel assembly to the bottom plate using 4pcs bolt M6X12 and 4pcs flange nut M6 2 Unscrew the switch button insert AA alkaline battery tighten the switch button Hardware Used Hardware Used Bolt M6 x12 x 4 Bolt Flange Nut x 4 Wrench x 1 x 1 EE FF II OO AA Alkaline Battery Not Included ...

Page 9: ...rt Secure them with 8pcs screw 3 16 4 4 Assebmle the flame screen to the upper support Secure the flame screen to the upper support using 8pcs screw 3 16 Hardware Used Hardware Used 3 16 Screw 3 16 Screw x 8 x 8 Philips screwdriver Philips screwdriver x 1 x 1 DD DD JJ JJ Assembly Instructions ...

Page 10: ...to the top of stud then put the reflector onto the stud secure them with 3 washers and 3 wing nuts 6 Carefully install the glass tube by lifting up and inserting through the center hole in the upper plate Ensure the black silicone ring is attached to the lower edge of the glass tube as illustrated Slide the glass tube through the hole of the lower plate cover and onto the middle plate Check and en...

Page 11: ...ing brackets with 4pcs 3 16 screws 8 Install the knob to M4X6 screw Hang the chain to the hole on the control box assy and put the pothook of front panel to the holes of bottom plate Hardware Used Hardware Used 3 16 Screw Knob Screw M4 x6 Chain x 4 x 1 x 4 x 1 x 1 x 1 x 1 DD KK HH MM JJ LL JJ Philips screwdriver Philips screwdriver Fixing Bracket Assembly Instructions ...

Page 12: ...eak testing See leak testing diagram for areas to check Turn all burner controls to the off position Turn gas supply valve on Brush a half and half solution of liquid soap and water onto all joints and connections of the regulator hose manifolds and valves Bubbles will indicate a gas leak Either tighten the loose joint or have the part replaced with one recommended by the Customer Care department ...

Page 13: ...leaners that are combustible or corrosive Remove debris from the burner to keep it clean and safe for use Cover the burner unit with the optional protective cover when the heater is not in use 3 Turn off the valve on the gas supply cylinder completely 4 After the pilot flame lights turn the variable control knob to maximum position and leave it there for 5 minutes or more befor turning the knob to...

Page 14: ...lve may be OFF Turn the gas valve ON Tank fuel empty Refill LPG tank Opening blocked Clean or replace opening Air in supply system Purge air from lines Pilot will not stay on Debris around pilot Clean dirty area Loose connections Tighten connections Thermocouple bad Replace thermocouple Gas leak in line Check connections Lack of fuel pressure Tank near empty Refill LPG tank Burner will not light P...

Reviews: