Albalá Ingenieros | Manual
AVP0622C01
• The AVP0622C01 module and the mounting frame should always be
installed, maintained, operated and removed by personnel with sufficient
technical qualifications. The equipment should never be placed in damp
areas, near splashing liquid, or in explosive or corrosive atmospheres.
Neither modules nor mounting frames can be used in applications that
could endanger human life.
3.3. Environmental considerations
This symbol indicates that this equipment must be deposited at a collection
point for proper waste treatment once it has reached the end of its useful
life.
3.4. Power considerations
The UR3000 and UR3100 mounting frames can house as many AVP0622C01 modules as
will fit in them.
3.5. Installing the module in the mounting frame
The steps needed to install the AVP0622C01 module with the rear board in the
mounting frame are:
1 - Disconnect all power cords from the power supplies of the mounting frame.
2 - Remove the blank panels covering the front and rear of the empty bays chosen for
installing the AVP0622C01 in the mounting frame.
3 - Install the XVP0622P01 rear board ensuring that its 12-pin connectors are properly
aligned with the mounting frame´s mating connectors. Check that the orientation of
the board is correct by looking at the placement of the text printed on it according to
the illustration below.
4 - Attach the rear board to the mounting frame with two M3 metric screws and tighten.
5 - Insert the AVP0622P01 board (main board of the AVP0622C01 module) into the front
of the mounting frame. The edges of the card slide into two plastic guides inside the
mounting frame.
6 - Affix the main board to the mounting frame using the two screws included on the
front panel.
After these steps, the module is ready to be connected to other equipment.
12
Summary of Contents for AVP0622C01
Page 2: ...AVP0622C01 ...
Page 4: ...AVP0622C01 ...
Page 7: ...Albalá Ingenieros Manual AVP0622C01 1 3 Block diagram 7 ...
Page 8: ...Albalá Ingenieros Manual AVP0622C01 AVP0622C01 8 ...
Page 15: ...Albalá Ingenieros Manual AVP0622C01 must be used 15 ...
Page 16: ...Albalá Ingenieros Manual AVP0622C01 AVP0622C01 16 ...
Page 19: ...Albalá Ingenieros Manual AVP0622C01 19 ...
Page 22: ...Albalá Ingenieros Manual AVP0622C01 AVP0622C01 22 ...
Page 23: ...Albalá Ingenieros Manual AVP0622C01 5 GLOSSARY BNC Bayonet Neill Concelman connector 23 ...
Page 24: ...Albalá Ingenieros Manual AVP0622C01 AVP0622C01 24 ...
Page 26: ...Albalá Ingenieros Manual AVP0622C01 AVP0622C01 26 ...