The valve pressure filter switch
is located at the
pressure filter in the valve pressure circuit, between
the closed center load sense pump and the control
valve. The sensor monitors the back-pressure
created by the filter element when in use. When the
back-pressure reaches a setting of 50 psi the switch
will trigger and prompt the operator for an element
change.
The filter does not have a bypass. The element must be changed at the appropriate time to
avoid element damage and system contamination.
T h e r e t u r n f i l t e r s w i t c h
i s
located at the return filter mounted on to the tank
top. The fluid returning from the cylinder control
valve is filtered before returning to tank at this
location. The sensor monitors back-pressure
created by the filter assembly while cylinder circuit
is in use. When the back-pressure reaches 25 psi
the switch will trigger and prompt the operator for
an element change.
This filter does not have a bypass. The element must be changed at the appropriate time to
avoid element damage and system contamination.
6.5 Operator Interface
The operator selects parameters provided by a menu system in the MDM display. The parameters are used to
establish how the boom unit functions. The menu system is comprised of two sections. The first section is
setup, the second section powers up the boom control circuit and cutter-head circuit. The following steps
outline how to successfully page through the menu system to execute operation.
Executing Set-up
The following representations will outline the steps necessary to execute set-up.
Summary of Contents for FC-0001
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 99: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Page 152: ......
Page 153: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 178: ...MAVERICK SOM 3 09 Printed in USA P N 02981992C...