OPERATION
PA91 02/08
Operation Section 4-15
© 2009 Alamo Group Inc.
OPERA
T
ION
6.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be
repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020
NOTE
: The mower Operator’s Manual and affixed Decals contain important instructions on the safe and proper
use of the mower. Maintain these important safety features on the mower in good condition to ensure the
information is available to the operator at all times.
All Safety Shields, Guards and Safety devices including (but not limited
to) - the Deflectors, Steel Guards, Gearbox Shields, PTO integral
shields , and Retractable Door Shields should be used and maintained in good working
condition. All safety devices should be inspected carefully at least daily for missing or
broken components. Missing, broken, or worn items must be replaced at once to reduce
the possibility of injury or death from thrown objects, entanglement, or blade contact.
(SFL-5)
Replace bent or broken blades with new blades. NEVER ATTEMPT TO STRAIGHTEN,
WELD, OR WELD HARDFACING ON BLADES SINCE THIS WILL LIKELY CRACK OR
OTHERWISE DAMAGE THE BLADE WITH SUBSEQUENT FAILURE AND POSSIBLE
SERIOUS INJURY FROM THROWN BLADES.
(SGM-10)
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011
KEEP AWAY FROM ROTATING ELEMENTS to prevent entanglement
and possible serious injury or death.
(SG-24)
Summary of Contents for 7191852C
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION ...
Page 36: ......
Page 37: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION ...
Page 41: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION ...
Page 53: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION ...
Page 99: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION ...