background image

 

Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany 

www.AKTOBIS.de

 

Email: [email protected] 

 
 
 
 
3.  Cleaning 
 

3.1 Cleaning the housing 

 

 

Please disconnect the mains plug before cleaning the construction dryer. 

 

Only use mild cleaning agents to clean your construction dryer. 

 

NEVER spray your building dryer (e.g. with water or similar). 

 
3.2 Cleaning the air filter screen 

 

The air filter screen at the front of the air intake filters lint, hair and coarse construction dust. Furthermore, the air 
filter ensures that less dust is deposited on the cooling fins, thus ensuring higher efficiency. Too much dust and dirt 
in the filter sieve or on the cooling fins reduces the dehumidification performance and can lead to a loss of 
efficiency in the 
In the worst case, this can even cause damage to your construction dryer, so the following applies in the case of 
coarse soiling or in rooms with a lot of construction dust: clean the air filter screen and also the inner evaporator 
unit* (*only possible after opening the casing) regularly ! 

 

 

Clean the filter whenever it can be assumed that the air intake is reduced by the dirty air filter screen or that dirt 
and dust has been deposited on the cooling fins. (This can sometimes even be the case daily on dusty 
construction sites. ) 

 

Switch off the unit and disconnect the mains plug ! 

 

Now remove the air filter screen by pulling it upwards by the tab. 

 

Wash the dirty sieve well under lukewarm water or vacuum it out thoroughly with a hoover. 

 

Allow the air filter screen to dry and then put it back into its holder from above. 

 
 
4.  Other notes 
 

Do not expose the compressor to temperatures above 45°C. Please do not do this even 
if the unit is not switched on/connected. This could damage the compressor ! 

 

The exhaust air of the building dryer is approx. 2°C - 3°C warmer than the supply air 
(room temperature). In smaller and well-insulated rooms this can lead to greatly 
increased room temperatures, this process is quite normal. 

 

For an effective and economical dehumidification operation, please close all doors and 
windows in the operating room of the building dryer if possible ! 
 
Stacking several units of the same type: If desired, two construction dryers can be 
stacked on top of each other. The construction dryer is already shaped accordingly for 
this purpose. See the diagram opposite.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for WDH-50B

Page 1: ...t To ensure that you get a lot of enjoyment from this product here are a few more tips In case of any problems We hope that the unit meets your expectations If despite the greatest possible care there...

Page 2: ...s First fasten the two axles with two hexagonal bolts each in the already existing holes on the bottom of the construction dryer see fig 2 B Now mount one of the small axle clamps cotter pins on each...

Page 3: ...otherwise it can lead to a reduction in performance and in the worst case to overheating and or fire Please always keep a distance of approx 20 cm to the wall to avoid possible overheating of the uni...

Page 4: ...ss and therefore a leak cannot be detected immediately by an emerging odour Make sure that the outlet of the exhaust air is always ensured and not obstructed by other objects Ensure a minimum distance...

Page 5: ...Info Aktobis de Description of the unit parts Supply air Transport handle Air filter screen Condensation tank compartment Impellers Exhaust air Tank full signal light Electricity consumption meter kW...

Page 6: ...t 3 minutes or be switched off before you press the main switch I O again In case of cold ambient temperatures or icing in the unit a sensor automatically controls a defrosting process Meanwhile the d...

Page 7: ...assumed that the air intake is reduced by the dirty air filter screen or that dirt and dust has been deposited on the cooling fins This can sometimes even be the case daily on dusty construction sites...

Page 8: ...n only remove moisture from the air and only indirectly from materials screed plaster Depending on the condition of the ceilings walls and fixtures it can take several weeks before they release the st...

Page 9: ...voltage or non observance of the assembly instructions Completely or partially dismantled units Conformity The building dryer has been tested and itself and or parts thereof have been manufactured und...

Page 10: ...____________________________ _________________________________________________________ _________________________________________________________ _______________________________________________________...

Reviews: