background image

 

Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany 

www.AKTOBIS.de

 

Email: [email protected] 

 
 

Assembly instructions: 
 

1.  Attachment to the tripod 

 
1.1. 

Take the round base plate out of the packaging and place the side with the protective felt on the floor. 

 

 
 
 
 
 
 
 
 
 

 

1.2. 

Next you need to connect (screw) the three (3) parts of the tripod together. Make sure that the telescope 
height lock is at the top. 
Note: The three parts of the tripod cannot be screwed together in any order. There are short and long 
threads. The short thread belongs/ fits in the base plate !

 

 

1.3. 

Then screw it to the central thread of the base plate.

 

 

 
 

1.4. 

After you have securely screwed the stand to the base plate, you can now insert the heating head into the 
telescopic holder from above. Make sure that the opening hole for the locking Allen screw is (becomes) 
visible through the counter opening of the heating head ! Now tighten (close) the lock for the telescope 
height. 

 
 
 
 
 

Summary of Contents for WDH-240GT

Page 1: ...ct To ensure that you get a lot of enjoyment from this product here are a few more tips In case of any problems We hope that the unit meets your expectations If despite the greatest possible care ther...

Page 2: ...s into the unit The radiant heater must not be used in the direct vicinity of bathtubs washbasins or swimming pools Only use the recommended voltage for operating the unit Make sure that the power cab...

Page 3: ...m distance to the front of at least 150 cm and to the side or upwards of at least 0 5 metres The installation height should be at least 180 cm Please switch off the unit immediately and disconnect it...

Page 4: ...ting head Stand plate Determination for telescope height 180 cm 200 cm Heating head with 2 Golden Tube heating tubes 3 part tripod Top Middle Bottom Main switch cable pull Remote control Heat level 1...

Page 5: ...t lock is at the top Note The three parts of the tripod cannot be screwed together in any order There are short and long threads The short thread belongs fits in the base plate 1 3 Then screw it to th...

Page 6: ...perly into the socket 2 2 Switch the unit on by pulling the main switch pull cord The unit then signals that it is ready for operation by the red operating light lighting up 2 3 The unit switch is loc...

Page 7: ...the appliance on sloping or uneven ground 4 4 Make sure that the mains cable never runs in front of the radiant heater or that the mains cable is not wrapped around the heating element 4 5 Do not oper...

Page 8: ...antled units Conformity The radiant heater has been tested and itself and or parts thereof have been manufactured under the following safety standards Tested by Dekra GS and of course with CE LVD EMC...

Reviews: