background image

is placed onto the bottom of base ring. Install

3

Open the valve, then turn the handle according to the

sign of C and H on the handle to regulate the temperature

of the water. (C=Cold,H=Hot)

.

6

Close

Open

Swing Spout

7

After installation is complete, remove aerator and rotate

handle to the closed position. Then turn on the water supply

valves, and check all connections for a leak. Turn on

your faucet and allow both hot and cold water to run at 

least one minute each, then Install the Aerator.

Faucet  Start Up

INSTALLATION PROCEDURES

You should clean all the dirts from valve outlets.

Turning off the water supply valves. This is usually 

found near the water meter. If you are replacing

an existing faucet, remove the faucet from the

sink and clean the sink surface thoroughly.

Install without deck plate. Make sure the O-ring

faucet through hole in sink. From underside sink,

put Plastic Washer and mounting nut. Position

faucet on sink properly and tighten mounting nut.

If necessary, tighten screws using a adjustable

wrench until the faucet is firmly connected to the

sink.

Connect the hot and cold water supply lines of the faucet

to the water supply valves.

2

1

2

3

5

4A

Install with deck plate. Place a bead of plumber’s

putty between faucet and sink. Place deck plate

over the three holes of sink. 

2A

Make sure the O-ring is placed onto the bottom

of base ring. Install faucet through deck plate.

From underside sink, put plastic  washer and

mounting nut. Position faucet on sink properly

and tighten mounting nut.

2B

Insert spray seat through far right-hand hole on sink, 

then tighten mounting nut using adjustable wrench.

Insert spray hose down through spray seat, then connect 

the spray hose to the outlet hose at the bottom of the tap 

and tighten it. 

4B

If you do not want to install the spray, please use the plug 

"L" to block-off  and tighten it.

If you do not want to install the spray.

Install side spray.

Pipe plug

Reviews: