background image

Switch on the device, wait until loading, and check the external power status in
the Ajax app. If there is no power, and you are using a terminal adapter, check

9. Reassemble the boards and the device body then tighten the screws.

Check that the battery and its cables are not clamped. When installed properly, the
boards stand firmly on all guides and do not stagger. Holding the boards together
with the back lid, turn the device over. The SIM card slots, power, and Ethernet
sockets should match accurately and fit the corresponding sockets, and the power
button should not be stuck.

Change the information about input voltage on the device body to avoid incorrect
power connections in the future. Use the special bundled sticker with the
instruction.

10. Connect the power (and Ethernet cable) to the appropriate sockets.

11. Switch on the 6 V power source.

Do not connect the power cable with a voltage that exceeds the acceptable input
voltage.

12. Switch on the device by holding the power button for 2 seconds.

13. Close and fix the SmartBracket mounting panel.

Summary of Contents for 6V PSU Hub 2

Page 1: ...installed by a qualified electrician only Before installing the power supply make sure that the device is disconnected from the mains When installing the 6V PSU Hub 2 Hub 2 Plus follow the general el...

Page 2: ...artBracket mounting panel shifting it down with force 2 Switch off the device holding the power button for 2 seconds 3 Disconnect power and Ethernet cables Wait 5 minutes for the capacitors to dischar...

Page 3: ...5 Remove the screws attaching the boards to the device body 6 Carefully remove both boards keeping them in the same plane and not disconnecting them There is a connector between boards do not break it...

Page 4: ...nboard using the eight pin connector between them Do not warp or bend the antennas while replacing the board this can cause the device to malfunction Please note the board contacts should be plugged i...

Page 5: ...over The SIM card slots power and Ethernet sockets should match accurately and fit the corresponding sockets and the power button should not be stuck Change the information about input voltage on the...

Page 6: ...up to 2 hours This will start a chemical reaction inside and ensure proper functioning Maintenance The device does not require technical maintenance Tech specs Compatibility Hub 2 and Hub 2 Plus Input...

Page 7: ...r 2 years after the purchase If the device does not function correctly please contact the Support Service first In half of the cases technical issues can be solved remotely Technical support 1 6V PSU...

Page 8: ...Subscribe to the newsletter about safe life No spam Subscribe Email...

Reviews: