
Aloft 120 - 2019
www.ais-inc.com
47
Glass Spine Screen Install
• Snap rail cover down onto
rail from above using block
of wood with soft mallet.
Rail Cover
• Insure Rail Cover is
properly seated
Rail Cover Installation
• If necessary,
shave excess
paint on tabs to
insure end cap is
properly seated.
• Tap gently using soft mallet
until end cap is properly
seated. DO NOT break tabs.
End Cap
2 places
End Cap Installation
47
P-INSALOFT120V2 Revision 03.07.2019