CONTENTS
3
3
4
5
5
7
7
8
9
10
10
10
11
11
11
12
12
12
13
13
13
14
15
15
15
15
1. PREPARING FOR INSTALLATION
······································································
1.1
Safety Percautions
·························································································
1.2
Accessories
··································································································
2. INDOOR UNIT INSTALLATION
···········································································
2.1
Installation Site Choosing
················································································
2.2
Install The Suspension Bolts
············································································
2.3
Handing The Indoor Unit
··················································································
2.4
Install The Drain Pipe
·····················································································
2.5
Install The Panel
····························································································
3. OUTDOOR UNIT INSTALLATION ······································································
3.1
Installation Site Choosing
················································································
3.2
Outdoor Unit Mounting Dimension
·····································································
3.3
Space Requirement For Outdoor Unit
·································································
3.4
Install The Outdoor Unit
················································································
3.5
Install The Drain Pipe For Outdoor Unit
······························································
4. REFRIGERANT PIPING WORK
··········································································
4.1
Flaring
·······································································································
4.2
Piping Work
·································································································
4.3
Refrigerant Pipe
··························································································
4.4
Air Evacuation
····························································································
4.5
Leakage Test
······························································································
5. WIRING
···········································································································
6. FINAL CHECK AND TRIAL OPERATION
····························································
6.1
Final Check List
····························································································
6.2
Manual Operation
·························································································
6.3
Trial Operation
·····························································································
7
GB-2