22
Pipe specification:
1. Pipe “a” diameter (between indoor and manifold pipe) (depends on indoor pipe)
Note:
High Wall AWSI-HBV007 AWSI-HBV009 gas pipe: Ø12.7mm
High Wall AWSI-HBV018 gas pipe/ liquid pipe: Ø15.88mm/9.52mm
Installation procedure
Antifouling measures
First, clean the pipe.
Position
Installation period
Measures
Outdoor
More than 1 month
Flat the pipe end
Less than 1 month
Flat the pipe end or seal with adhesive tape
Indoor
Nothing to do with period
Outdoor branch pipe
Manifold pipe
Model Capacity
(kBtu/h)
Gas pipe
Liquid pipe
Diameter (mm) Connecting method Diameter (mm) Connecting method
07
Ø9.52
Flared
Ø6.35
Flared
09
Ø9.52
Ø6.35
12
Ø12.7
Ø6.35
16
Ø12.7
Ø6.35
18
Ø12.7
Ø6.35
24
Ø15.88
Ø9.52
28
Ø15.88
Ø9.52
30
Ø15.88
Ø9.52
38
Ø15.88
Ø9.52
48
Ø15.88
Ø9.52
72
Ø25.4
Braze
Ø9.52
96
Ø25.4
Ø9.52