background image

 

Version 1.0 17/02/17 

 

 

Page 

1

 of 

5

 

Sealed Building 

 

 

 

 

 

 

 

 

 

 

 
 

 

IMPORTANT 

AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT 

 YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. 

 

Site survey: 

 

1.  Carry out a survey of the area where the Sealed Building will be located, and check 

for any overhead/underground cables. It’s important that this is carried out to avoid 
ground anchors penetrating underground services, and the Sealed Building coming 
into contact with overhead cables when inflated. 

2.  You  should  provide  an  adequate power  supply  to  the fan,  this  should  adhere  to 

your local power regulations. 

Reviews: