Included with your Sealed Building: 

Extra equipment needed in addition what is supplied with your inflatable: 

Suitable 240v Power Supply to operate the fan

Extra equipment you could consider for your new inflatable: 

Ground sheet to protect the underside of your inflatable

Sandbag covers to anchor your inflatable where anchors cannot be used

Sack truck to move your inflatable safely

RCD to attach to your extension lead

This inflatable can be set up and packed away by 2 persons who have 
had proper manual handling training and uses the correct equipment 
to move the inflatable. 

Set up: 

Please note the inflatable is packed in a way, that its end (or back) is rolled out first, and the 
direction of rolling will usually show the direction the inflatable will face when inflated. This is 
relevant, because some inflatables could represent a challenge to move or position them because 
of their weight after they are unrolled/inflated. 

-

Position the folded Sealed Building

 

in the desired place and direction.

-

Unroll and unfold.

PLEASE NOTE YOU WILL FIND THE INFLATION/DEFLATION VALVES 

 INSIDE THE UNIT, ON THE LOWER PARTS OF THE CORNER COLUMNS, 

 WHICH ARE ONLY ACCESIBLE THROUGH THE DOORS. 

The inflatable 

in its bag 

Anchor Pegs

 

Door Nets 

Webbing Straps 

for routing cables

 

Ropes

 

Land Operation 

Manual

 

Repair Kit

 