Page 26
TYPICAL HOOKUP
FIG 3
5.
DIMENSIONS and MOUNTING:
PC Board Dimensions
: 4.8” x 5.66”
Mounting: 5 Nylon standoff snap-in feet
Hole centers: 4
at: corners spaced 4.5” x 5.26”
1
at: down 1.40”, and in-board (left) 0.960” from center of top
right corner standoff.
Recommended hole size: 0.191”
START-UP PROCEDURES .
Do not start the air handler or water
heater until ALL air has been purged!
1. Fill the water heater or boiler, and or
storage tank with water.
2. Purge all air for the domestic water
lines by opening faucets at the remote
parts of the plumbing system.
3. Purge all air from the space heating loop
by closing the isolation valve on the return
leg of the loop and open the drain to
Summary of Contents for MaxAir 100 LV
Page 31: ...Page 31 WIRING DIAGRAM STANDARD UNITS...
Page 32: ...Page 32 WIRING DIAGRAM MAXe UNITS...
Page 33: ...Page 33 FAN COIL DIMENSIONS AND RETURN AIR SIZE LOCATION...
Page 34: ...Page 34...
Page 35: ...Page 35...
Page 36: ...Page 36...
Page 41: ...Page 41 2 AND 2 5 TON EVAPORATOR COIL SIZES 70 IPCE 24 30A...
Page 42: ...Page 42 SAMPLE PIPING SCHEMATICS...
Page 43: ...Page 43...
Page 44: ...Page 44...
Page 45: ...Page 45...