background image

 

 

 

IO-123090-GFW-020113 

- 6 - 

©2013 AirMark 

 

 

Fig.5. Figure showing the sensing bulb mounted in a 
vertical orientation 
 

CAUTION

  If the TXV sensing bulb is mounted 

vertically; the capillary 

MUST

 be directed upwards. 

The bulb must be mounted on the wall opposite to 
that being directly hit by the refrigerant and oil 
leaving the distributor tubes. 

 

Field – Installed Expansion Valve Coils 

 

Remove the valve identification sticker from the 
valve and place it adjacent to the Airmark model 
number on unit name plate. 

 

When installing an expansion valve, it is not 
necessary to remove all the access panels and 
slide the coil out of the housing.  

 

1)  Disassemble the flowrator body using two 

wrenches. Unscrew the body with a 
counter-clockwise motion.  

2)  Replace the white Teflon seal in place 

(located between the halves). 

3)  Remove the existing flowrator piston using 

a small wire or pick. 

4)  Inspect the TXV box to confirm that the 

valve is compatible with the refrigerant in 
the system. 

5)  Remove the valve from the box and note 

the location of the inlet side (threaded 
male port) and the outlet side (female 
swivel nut port). 

6)  After ensuring that the white Teflon seal is 

still in place inside the flowrator body, 

screw the female swivel nut onto the 
flowrator body. 

7)  Place the attachment nut on the liquid line. 

8)  Braze the stub-out portion to the liquid line 

and let cool.  

 

WARNING

  Do not attempt to touch the braze 

joint while hot. Touching it may cause severe 
burns.  

9)  Remove the additional white Teflon seal 

ring from the box and place on the 
shoulder just inside the inlet port. Screw 
the nut attached to the stub-out portion of 
the flowrator body onto the inlet port of the 
TXV. 

10) Tighten all connections taking care to use 

proper back up.  

 

Some Airmark coils come with a Schrader valve on 
the suction line. If a Schrader port is present 

11) Remove valve stem from the Schrader port 

mounted on the suction line  

12) Screw flare nut on TXV equalization tube 

in to the Schrader valve stem 

 

Coils without Schrader Ports 

13) Locate  a  convenient  spot on the suction 

line and punch a ¼” hole with a pick or 
other suitable tool. 

CAUTION

    Do 

NOT 

drill a hole as chips will 

enter suction manifold.  
 

14) Insert TXV equalizer tube approximately 

3/8” into the hole and apply solder to seal. 

 

 

 

 

Summary of Contents for GFW SERIES

Page 1: ..._________________________ SERIAL ____________________________________________________ INSTALLER __________________________________________________ INSTALLATION DATE ___________________________________...

Page 2: ...dification of the unit to operate with alternative power sources Inspection On receiving the product visually inspect it for any major shipping related damages Shipping damages are the carrier s respo...

Page 3: ...he drain access panel in the bottom of the unit if this is a bottom return application In case of a front return application the front access panel should be removed and discarded If an accessory gril...

Page 4: ...ton is stamped on the piston body Instruction for piston change 1 Turn the 13 16 nut once to release any residual pressure in the coil 2 After ensuring that the coil is free of any residual pressure d...

Page 5: ...ilure to eliminate gaps will impair the proper functioning of the TXV valve It is recommended that the TXV bulb be installed parallel to the ground in a horizontal plane The bulb position should be ab...

Page 6: ...inlet side threaded male port and the outlet side female swivel nut port 6 After ensuring that the white Teflon seal is still in place inside the flowrator body screw the female swivel nut onto the f...

Page 7: ...Note Terminals T and N located on the top right side of the board are not intended for field use and should be left un connected CAUTION The aquastat AQ jumper must be in the OFF position at all times...

Page 8: ...9 Use flexible piping and insulate all pipes Plumbing must be in compliance with state or local codes Code CMR248 in Massachusetts The units for hydronic heat have different top and heater box config...

Page 9: ...To properly check the unit s operation the installer should have an electrical current measuring device 0 10 amp Amprobe Fluke air pressure measuring device 0 1 0 in slope gauge and a temperature mea...

Page 10: ...he equipment The filter s removes dust and debris from the air thus helping to keep your air conditioned space clean More important the filter keeps dust and debris from collecting on the heat transfe...

Page 11: ...er heater BTU INPUT assumes a water heater recovery efficiency of 76 For mild climates BTU INPUT structure s heat loss x 1 51 For colder climates BTU INPUT structure s heat loss x 1 58 3 Pump Replacem...

Page 12: ...ndler is undersized for space being heated h Water heater is undersized Note All units installed in Massachusetts are required to be in compliance with CMR 248 Massachusetts State Plumbing Code and or...

Page 13: ...IO 123090 GFW 020113 2013 AirMark HIGH VOLTAGE disconnect all power sources prior to servicing Failure might lea d to safety hazard Wiring diagram for GFW models...

Reviews: