![AirMan SDG25S-6A7 Instructional Manual Download Page 20](http://html1.mh-extra.com/html/airman/sdg25s-6a7/sdg25s-6a7_instructional-manual_2878218020.webp)
3. Installation
3
-
1
3.1 Transporting Unit
Transportation
Use the lifting bail
1
at the center of bonnet for hoisting up
and down the machine.
Since the rope hook is not strong enough to be used for
hoisting, never use it to prevent falling accident.
When transporting the machine, be sure to put it on the truck
bed and use the rope hooks to secure it with rope
Do not hoist up the machine while it is running. Otherwise, a
fatal trouble or serious accident may occur.
3.1.1 Lifting
Use the lifting bail 1 fitted on center of bonnet.
Select an appropriate crane or truck by referring to the
mass and dimensions mentioned in “Specifications”.
Only a qualified crane operator is allowed to operate a
crane.
1
A040151
A040151
1
Summary of Contents for SDG25S-6A7
Page 13: ...1 Safety 1 10 SDG45S 6A6 SDG65S 6A6 6 2 3 5 4 7 8 1 DETAIL OF INSTRUMENT PANEL 9 A040572...
Page 14: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 37: ......
Page 38: ......
Page 40: ......
Page 41: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 53: ......
Page 55: ......
Page 63: ...8 Specifications 8 5 8 2 Outline drawing SDG25S 6A7 A040577...
Page 64: ......
Page 65: ......
Page 66: ......
Page 70: ...9 Wiring Diagram 9 4 9 2 Engine Wiring Diagram SDG25S 6A7 A040580...
Page 71: ...9 Wiring Diagram 9 5 SDG45S 6A6 A040581...
Page 72: ...9 Wiring Diagram 9 6 SDG65S 6A6 A040582...
Page 73: ...9 Wiring Diagram 9 7 SDG100S 6A6 A040659...
Page 74: ......
Page 75: ......