M
ain
te
nanc
e
IT Cooling
LogiCool InRak™
81
InRak™ Technical Manual 7462807 V1.11.0_04_2016
Service Tools/Test Equipment
•
Spanners
•
Manometer
•
Thermometer
•
Refractometer
Safety Equipment
•
Safety Glasses / Goggles
•
Gloves
•
Overalls
Maintenance
Waterside
Procedures
Binder Points
Binder points should be fitted to both the flow and return pipe work adjacent to the evaporator.
Water Strainer
A water strainer must be fitted to the inlet side of the evaporator.
Failure to do so may result in severe damage and will void the AIREDALE warranty.
Water Flow Rate
Check that the design water flow rate is available to the unit. If not available do not turn unit on.
Waterside Pressure Drop
Measure the waterside pressure drop of the unit ensuring that the pump (if fitted) is operating.
Glycol Strength
Check and record the glycol type and strength. Low levels of glycol can cause freeze up problems when operating at
low temperatures or during the unit off state during cold ambient conditions.
Glycol concentration is measured by use of a Refractometer.
W
aterside
Task
Frequency
3 Months 12 Months
60 Months
Check pressure drop of water strainer. If excessive clean the strainer
●
Visually inspect pipe and pipework insulation. Check pipework clamps are
secure
●
Inspect for water leakage
●
Check pressure drop of evaporator. If excessive clean evaporator
●
Check condition of Water/Glycol solution to ensure that the system is protected
against corrosion, scale and microbiological fouling, ensuring maximum heat
transfer efficiency
●