Condensing Units
CUS 15 - 60 / HCU 20
²
30D
Chillers & Condensing Units
Installation & Maintenance:Part No: 6259592 IM 07/14
19
Commissioning Procedure
±
Example
CONDENSERS/CONDENSING
UNITS - C/CUS/CUHS/HCU/CFCUS
Ai r e d a l e I n t e r n a t i o n a l
Ai r C o n d i t i o n i n g L t d
TO BE COMPLETED IN CONJUNCTION WITH COMMISSIONING PROCEDURE
RETURN WHITE COPY TO AIREDALE/RETAIN PINK COPY
Leeds Road, Rawdon, Leeds
LS19 6JY ENGLAND
Tel: 0113 239 1000
Fax: 0113 250 7219
Engineer:
Company:
Date:
Model:
Serial No:
Site Ref:
1
Pre Commissioning Checklist
1.1
Unit Condition Satisfactory
Comment:
1.2
Holding charge retained
Circ 1
Yes/No Circ 2
Yes/No
1.3
Electrical connections tight
V
1.4
Voltage at mains supply
L1-L2
V L2-L3
V L3-L1
V
1.5
System pressure test:
I
Initial test pressure
Circ 1
Barg
Circ 2
Barg
ii
Final test pressure
Circ 1
Barg
Circ 2
Barg
iii
Test duration
Circ 1
Hrs
Circ 2
Hrs
2
Commissioning Checklist
2.1
Final system vacuum
Circ 1
mBar
Circ 2
mBar
2.2
Vacuum hold time
Circ 1
Min
Circ 2
Min
2.3
Refrigerant type
2.4
Refrigerant charge
Circ 1
kg
Circ 2
kg
2.5
Timer settings correct and operational (if fitted)
Low pressure override - 3mins
Circ 1
Mins
Circ 2
Mins
Defrost - 30 mins
Circ 1
Mins
Circ 2
Mins
Anti cycle timer -10 mins
Circ 1
Mins
Circ 2
Mins
2.6
Head pressure control set
Circ 1
Barg
Circ 2
Barg
2.7
HP/LP switch cut outs:
Circ 1
Barg
Circ 2
Barg
I
LP cut out - 2.0 barg
LP Cut Out
Barg
LP Cut Out
Barg
ii
LP cut in - 3.0 barg
LP Cut In
Barg
LP Cut In
Barg
iii
HP cut out - 27.0 barg
HP Cut Out
Barg
HP Cut Out
Barg
2.8
HGBP valve setting (if fitted)
Circ 1
Barg
Circ 2
Barg
2.9
Superheat at compressor
Circ 1
°C
Circ 2
°C
2.10 Added oil volume (if applicable)
Circ 1
Lt
Circ 2
Lt
2.11 Operating conditions:
i
Suction pressure
Circ 1
Barg
Circ 2
Barg
ii
Discharge pressure
Circ 1
Barg
Circ 2
Barg
2.12 Compressor Amps
(CU & CFCU)
L1
Amps
L1
Amps
L2
Amps
L2
Amps
L3
Amps
L3
Amps
2.13 Condenser Fan Amps
/
/
Amps
/
/
Amps
3
Other comments
IMPORTANT: THIS IS AN IMPORTANT WARRANTY DOCUMENT AND WARRANTY COULD BE
INVALIDATED SHOULD AIREDALE NOT HOLD A COPY ON FILE.
QTYENG 10 - 08/98