Air King AK965FL Operating Manual Download Page 2

SECTION 2

New Construction

1.

Mounting Rail Installation:

 Install the rails on the housing and

position the housing next to the joist. Line up housing so it will be
flush with the finished ceiling. Secure the ends of the rails with
screws or nails (not included) to the joists and slide housing into
final position 

(Figure 4)

.

1a.

Mounting Tab Installation:

 Line up housing so that it will be flush

with the finished ceiling. Position the fan so that the tabs rest flat
against the joist and secure with screws or nails (not provided) to
ensure proper installation 

(Figure 5)

.

SECTION 3

Existing Construction

1.

Mounting Rail Installation: 

Set housing in position between the joist

and trace an outline onto the ceiling material 

(Figure 6)

. Set housing

aside and cut opening, being careful not to cut or damage any electrical
or other hidden utilities. Install the rails on the housing and position
the housing in the previously cut hole so that it is flush with the finished
ceiling. Secure the ends of the rails to the joists with screws or nails
(not provided) to ensure proper installation 

(Figure 4)

.

INSTALLATION INSTRUCTIONS

CAUTION:

 

MAKE SURE POWER IS SWITCHED OFF AT SERVICE

PANEL BEFORE STARTING INSTALLATION.

SECTION 1

Preparing the Unit

1.

Unpack fan from the carton and confirm that all pieces are present.
In addition to the unit you should have:

1 - Grill with Light Lens
4 - Mounting Rails
2 - 2 Function Switches
1 - Quad Wall Plate
1 - Instruction/Safety Sheet

2.

Remove the two machine screws holding the light reflector in place.
Keep the reflector and screws in the carton until needed so they
do not get damaged or lost 

(Figure 1)

.

3.

Remove the wire compartment cover by loosening the two screws
holding the cover in place 

(Figure 2).

WARNING:

 

DO NOT INSTALL OVER A TUB OR MOUNT IN A

SHOWER STALL ENCLOSURE.

4.

Choose the location for your unit. To ensure the best air and sound
performance, it is recommended that the length of ducting and the
number of elbows be kept to a minimum, and that insulated hard
ducting be used. Larger duct sizes will reduce noise and airflow
restrictions. This fan will require at
least 7" of clearance in the ceiling, and
will mount through drywall up to 3/4"
thick. The fan can be mounted directly
to the joist using the mounting tabs on
the side of the housing or between 16"
on center joists using the 4 provided
mounting rails.

5.

Remove the electrical knockouts using
a straight-blade screw driver 

(Figure 3)

.

Figure 1

www.airkinglimited.com

965 Rev. A 9-05

2 of 12

Figure 6

Figure 4

Joist

Housing

Mounting Rails

Screws

Figure 2

Screws

Wire

Compartment

Cover

Figure 3

Figure 5

Summary of Contents for AK965FL

Page 1: ...chimney of fuel burning equipment to prevent back drafting Follow the heating equipment manufacturer s guideline and safety standards such as those published by the National Fire Protection Associati...

Page 2: ...N 1 Preparing the Unit 1 Unpack fan from the carton and confirm that all pieces are present In addition to the unit you should have 1 Grill with Light Lens 4 Mounting Rails 2 2 Function Switches 1 Qua...

Page 3: ...ng the Unit Figure 10 1a Mounting Tab Installation Position housing against the joist and trace an outline of the housing onto the ceiling material Figure 7 Set housing aside and cut opening being car...

Page 4: ...tor in place with the two screws removed during Step 2 in SECTION 1 Preparing the Unit so grill fits snuggly against ceiling Figure 14 CAUTION FAILURE TO SECURE THE REFLECTOR SCREWS MAY RESULT IN A RA...

Page 5: ...NIT 1 Cleaning the Grill Reverse the instructions in Section 6 Completing the Installation to remove grill Use a mild detergent such as dishwashing liquid and dry with a soft cloth NEVER USE ANY ABRAS...

Page 6: ...49 13 4 Hex Nut 5S3402050 14 1 Vent Blower Wheel 5S3402051 15 3 8 Screw 5S1999004 16 1 Wire Compartment 5S3402097 17 4 Receptacle 5S3402053 3 5 9 10 11 12 REPLACEMENT PARTS DIAGRAM Qty Description Rep...

Page 7: ...r pr venir un refoulement Suivre les directives du fabricant de l quipement de chauffage et les normes de s curit telles que celles publi es par la National Fire Protection Association NFPA et de la A...

Page 8: ...a boite et confirmer que toutes les pi ces sont pr sentes En plus du ventilateur d vacuation vous devriez avoir 1 Grille avec les Lentilles de l clairage 4 Traverses de Montage 2 Commutateurs 2 foncti...

Page 9: ...ration de l unit Figure 10 1a Installation des onglets de montage Positionner le ch ssis contre la solive et tracer un contour du ch ssis sur le mat riau du plafond Figure 7 Mettre le ch ssis de c t e...

Page 10: ...es deux vis enlev es durant l tape 2 de la SECTION 1 Pr paration de l unit de sorte que la grille s ajuste solidement contre le plafond Figure 14 AVERTISSEMENT UN MANQUEMENT BIEN SERRER LES VIS DU R F...

Page 11: ...es de remplacement dans les hottes de cuisine ou les combin s ventilateur lumi re chaufferette pour salle de bain Aussi tout dommage ou d faillance caus par un abus une mauvaise utilisation une instal...

Page 12: ...ecteur 5S3402055 20 1 Grille 5S3402056 21 1 Ch ssis de lentilles 5S3402057 22 1 Lentilles de Verre 5S3402058 23 2 Vis du r flecteur 5S3402059 24 1 Moteur Chauffage 5S3402060 25 1 Roue de la soufflante...

Reviews: