Aiphone GW-LE8 Instructions Manual Download Page 3

WIRING DIAGRAM:

GW-LE8 WITH GW-4P, USING LEM-1DL/C MASTER STATIONS

AC Power

~
~

Door Strike

GW-LE8

GW-4P

1

2

3

4

D+

D-

Yel

Blu

Blu

Blu

Blu
Blu
Blu
Blu
Blu

E

-

+

R

1

EL
EL

LEM-1DL/C

~
~

PT-1210N

E

-

+

R

1

EL
EL

LEM-1DL/C

~
~

PT-1210N

E

-

+

R

1

EL
EL

LEM-1DL/C

~
~

PT-1210N

E

-

+

R

1

EL
EL

LEM-1DL/C

~
~

PT-1210N

RY-PA

~
~

AC Power

Door Strike

Blk

Yel

LEF-5 #1

GW-LE8

-

+

PS-12C

Remove D+/D-

jumper on all

masters.

GW-LE8 WITH GW-4P & GW-2P, USING LEF-5 MASTER STATIONS

LEF-5 #5

LEF-5 #6

LEF-5 #4

LEF-5 #3

LEF-5 #2

GW-4P

GW-2P

E

-

+

R

1

K1

L

E

-

+

R

1

K1

L

E

-

+

R

1

K1

L

E

-

+

R

1

K1

L

E

-

+

R

1

K1

L

E

-

+

R

1

K1

L

D+

D-

Yel

Blu

Blu

Blu

Blu

Blu

Blu
Blu
Blu

1

2

3

4

1

2

NOTES:

1. In this example, the door station rings in on station #1 of each master station.
    It can be wired to any unused station number.
2. Only components of the entrance panel that include wire connections are shown here.
3. For complete wiring information, please see the standard LEF instructions.
    If additional master stations are to be installed in each office/suite, wire them per the standard instructions.

WIRING DIAGRAM:

Pg. 3

NOTES:

1. Only components of the entrance panel that include wire
connections are shown here.
2. For complete wiring information, please see the LEM-1DL/C
instructions.

Install jumper

between D+/D-

Reviews: