The racks are durable and made of  Aluminium 6005-T5 and stainless steel SUS304 hardware, 
includes a 25 year warranty.

Compliant with the following standards:
GB50009-2001
GB50011-2001
GB/T 13912-92
GBT 14846-2008
GB-T 6892-2006
GB50429-2007
GB50017-2003
AS NZS 1170
ASCE/SEI 7-05
ASCE/SEI 7-010
2007 California Administrative Code
IBC 2006
Euro Code 8
DIN1055
EN 1991-1-3 -      Snow Load
EN 1991-1-4 -      Wind Actions

Summary of Contents for PV6X120RACK

Page 1: ...Ground Mounting System I Installation Manual PV6X120RACK PV6X250RACK...

Page 2: ...lar products specializing in PV mounting systems We have been providing products for back up and off grid power applications for over 20 years AIMS Power has DC to AC power inverters deep cycle batter...

Page 3: ...liding motion The racking system includes pre assembled legs that unfold quickly allowing for easy bolt connection minimizing labor Various types of bases may be used Check with local regulatins When...

Page 4: ...udes a 25 year warranty Compliant with the following standards GB50009 2001 GB50011 2001 GB T 13912 92 GBT 14846 2008 GB T 6892 2006 GB50429 2007 GB50017 2003 AS NZS 1170 ASCE SEI 7 05 ASCE SEI 7 010...

Page 5: ...rack from the front PV6X120RACK PV6X250RACK 86 5 8 14 1 2 53 3 8 35 1 4 60 7 8 125 7 8 23 1 4 67 3 8 48 5 8 75 1 2 87 L x 4 1 2 H x 2 1 4 W 126 L x 3 7 8H x 2 3 8 W PV6X120RACK RAIL PV6X250RACK RAIL...

Page 6: ...hor studs with Ramset Chemset REO502 chemical injection anchoring system Minimum anchor embedment depth of 90mm with concrete strength of 32MPa There are several ways to mount the racks depending on a...

Page 7: ...m spacing between legs Features 25 years Type 2 Ordinary 1 250 2 20 Design Life Importance Level Annual Probability of Exceedance Terrain Category to AS1170 2 Maximum Pitch Aluminum Rails Maximum Sola...

Page 8: ...T5 Includes Quantity 9 a A2 70 M8 Hexagon screw b Aluminum fixing nut 3 Mid Clamp AL 6005 T5 Includes Quantity 9 a A2 70 M8 Hexagon screw b Aluminum fixing nut 4 HD Rail Clamp AL 6005 T5 Includes Qua...

Page 9: ...9 www Aimscorp net Installation Steps 1 Unfold the pre assembled leg and connecting upright Fasten the base of the legs to the attached anchor bolts Tighten all anchor bolts to secure leg and upright...

Page 10: ...10 www Aimscorp net...

Page 11: ...11 www Aimscorp net 2 Once legs are secure ensure the legs and uprights are aligned before installing the cross rails...

Page 12: ...f the rails on the upright To assist installers the bottom rail clamps are pre assembled in the recommended position Adjust as required L Solar Panel length 4 Place the rails on the pre assembled legs...

Page 13: ...13 www Aimscorp net...

Page 14: ...rails 6 Use end clamps with M8 25 Hexagon screws and fixing nuts to attach solar panels to the rails Adjacent solar panels are attached by using mid clamps with M8 Hexagon screws The hexagon screw len...

Page 15: ...15 www Aimscorp net...

Page 16: ...16 www Aimscorp net 8 Repeat steps until installation is completed AIMS POWER 9550 Gateway Drive Reno NV 89521 Tel 775 359 6703 Fax 775 359 6753 Email sales aimscorp net techsupport aimscorp net...