agui OKATT DNP16-01 Manual For Installation And Use Download Page 3

DNP16-01 

MANUAL FOR INSTALLATION AND USE

 

 

By:  E. Irazu. 
Reviewed by: J. Fernández 

DNP16-01. PIVOTING BUFFER SUPPORT

 

BRAND PRODUCT 

DEPARTMENT

 

 

 

 

 

 

3

 

Rev:2 

 

4)

 

TASKS PRIOR TO ASSEMBLY:

 

 

Use the assembly diagram to identify the location of the buffer support and perform the following checks:  
 
Tasks prior to assembly: 
 

 

Check Depth X of the buffer support and cross check against the project design. 

 
 
 
 
 
 
 
 
 
 
 

 

Check the type of buffer ensuring that it is compatible with the buffer support. 

 

Check type of wall fixture. There are three possible situations: 

-

Direct: 

The buffer support is mounted directly onto the wall. 

-

With chocks:

 When the distance to the wall is between 5-30 (5 mm intervals) 

-With L fixtures:

 When the distance to the wall is between 35-80 (5 mm intervals) 

 

Check that the area for fixing the buffer support to the wall/structure is clear and suitable for the 
required fixture. 

 

(NB: The necessary wall plugs are not provided and must be appropriate or the type of wall. The tensile 
load on each fixture point is 75 kg). 

 

5)

 

MOUNTING THE BUFFER SUPPORT:

 

 

The first step is to assemble the 

shaft

 - provided disassembled in the box - and place the 

plate

 in a horizontal 

position. 

 

 

 
 
 

Shaft 

Plate 

Summary of Contents for OKATT DNP16-01

Page 1: ...AGUI cannot accept liability for any damage caused by incorrect handling or as the result of action other than that indicated in this manual The product guarantee may be rendered invalid if used inco...

Page 2: ...a selection of chocks between the buffer support and the wall and 35 80 continuous mm regulation through the use of fixtures VERTICAL BUFFER SUPPORT KIT VERTICAL BUFFER SUPPORT BAG OF ACCESSORIES The...

Page 3: ...l fixture There are three possible situations Direct The buffer support is mounted directly onto the wall With chocks When the distance to the wall is between 5 30 5 mm intervals With L fixtures When...

Page 4: ...o adjust how the plate lies against the buffer The image shows the assembly position for the supports Regulation of lateral supports It is very important that when the buffer support is not activated...

Page 5: ...ufacturer s directions for proper installation It is essential to observe the torque value which will vary depending on model and manufacturer Plumbing and fixing the buffer support Reposition the buf...

Page 6: ...is to guide the insertion of the cables to avoid excessive angles or entrapment The image shows how to position these pulleys Pulleys 1 and 2 are placed on the floor of the pit to align the cable with...

Page 7: ...g them at the exact length required to prevent any excess loose cables inside the pit The green cable can be shortened from the handle but loosening the set screw and sliding it until the cable is at...

Page 8: ...d to the electricity supply following the indications on the diagrams Right side Monitors the active buffer support position Left side Monitors the resting buffer support position Check operation Once...

Page 9: ...ems with reduced headroom the maintenance technician must first open the door of the lowest floor and activate the vertical buffer support The mechanism is activated and deactivated from floor level w...