6
AGORA
MODELS
S T E P 1
AT TA C H T H E F R O N T F L O O R PA N T O T H E
C H A S S I S A S S E M B LY
Take the Front Floor Pan and position it above the Chassis
Assembly that you assembled in Stage 23. Align the three
eyelets on the rear of the Front Floor Pan with the three
lugs on the Chassis Assembly. Then align the screw holes
in the front of the chassis, see picture 6. Fix one MP03
screw in the largest anchor hole as indicated in picture 3.
Do not tighten this screw fully – it will need to be removed
at a later stage.
Stage 24: Front Floor Pan
1
2
P L E A S E N O T E
Only loosely connect the Floor Pan for now – do not tighten the screws. The Floor Pan
will have to be removed later to enable the exhaust pipes to be attached.
!
E XP E R T T I P
Fully tighten all the screws to make sure
that the threads are fully cut, then slack
the screws off a turn. This will make
removal and reassembly easier.
!
3
Summary of Contents for Shelby GT500 1967 Super Snake
Page 4: ...4 AGORAMODELS SHELBY SUPER SNAKE Stage 23 complete Stage 23 Middle Chassis...
Page 8: ...8 AGORAMODELS SHELBY SUPER SNAKE Stage 24 complete Stage 24 Front Floor Pan...
Page 17: ...17 AGORAMODELS SHELBY SUPER SNAKE Stage 27 Front Chassis Stage 27 complete...
Page 22: ...22 AGORAMODELS SHELBY SUPER SNAKE Stage 29 Steering Rods Stage 29 complete...