background image

1

AGORA

MODELS

STAGE 23: MIDDLE CHASSIS

 

STAGE 24: FRONT FLOOR PAN 

STAGE 25: DRIVESHAFT 

STAGE 26: GEARBOX AND CROSSMEMBER 

STAGE 27: FRONT CHASSIS

STAGE 28: FRONT FENDER SPLASH GUARDS

STAGE 29: TIE ROD ASSEMBLY

Tie Rods and Center Link

STAGE 30: STEERING ASSEMBLY

Steering Gear, Pitman Arm and 

Suspenion Arm Mounts

Pack 04 | Build Instructions

Your Shelby GT500 Super Snake is a finely detailed model replicating 

every aspect of the original car. From the paint colour to the smallest 

interior details, every piece is precisely reproduced.

In your fourth model pack, you will assemble:

Summary of Contents for Shelby GT500 1967 Super Snake

Page 1: ...STAGE 29 TIE ROD ASSEMBLY Tie Rods and Center Link STAGE 30 STEERING ASSEMBLY Steering Gear Pitman Arm and Suspenion Arm Mounts Pack 04 Build Instructions Your Shelby GT500 Super Snake is a finely de...

Page 2: ...rews may damage the parts When securing parts together using multiple screws fit each screw loosely to ensure all the parts are correctly aligned before gently tightening them firmly but not overtight...

Page 3: ...bly that you assembled in Stage 22 Align the four screw holes at the rear end of the Middle Chassis with the corresponding lugs on the Rear Chassis Assembly Press the two together paying particular at...

Page 4: ...4 AGORAMODELS SHELBY SUPER SNAKE Stage 23 complete Stage 23 Middle Chassis...

Page 5: ...g to connect the Front Floor Pan to the Chassis Assembly Name Quantity Front Floor Pan 1 Screws TYPE MD02 5 inc 1 spare Screws TYPE MP03 2 inc 1 spare Screws TYPE MD06 5 inc 1 spare STAGE 24 PARTS LIS...

Page 6: ...of the chassis see picture 6 Fix one MP03 screw in the largest anchor hole as indicated in picture 3 Do not tighten this screw fully it will need to be removed at a later stage Stage 24 Front Floor Pa...

Page 7: ...place 4 x TYPE MD02 screws in the anchor points indicated in picture 4 Tighten the screws but be careful not to overtighten Then place 2 x TYPE MD06 screws in the anchor points located on each side of...

Page 8: ...8 AGORAMODELS SHELBY SUPER SNAKE Stage 24 complete Stage 24 Front Floor Pan...

Page 9: ...he Driveshaft and attach it to the Chassis Assembly STAGE 25 PARTS LIST Name Quantity Driveshaft upper half 1 Driveshaft lower half 1 Screws TYPE MP01 3 inc 1 spare Screws TYPE MP02 4 inc 1 spare Driv...

Page 10: ...AKE ST EP 1 ASSE MBL E THE D RIVESHAF T Take the two halves of the driveshaft and with the flat side of each facing one another press together so that they re flush Fix together using 3 x MP02 screws...

Page 11: ...whilst also ensuring the lugs on the upper half of the Driveshaft fit into the two corresponding holes in the Chassis Assembly Holding the Driveshaft carefully in place turn the chassis over and secur...

Page 12: ...E Now you are going to connect the Gearbox to the Chassis Assembly Name Quantity Gearbox 1 Gearbox Crossmember 1 Screws TYPE MP01 5 inc 1 spare STAGE 26 PARTS LIST Gearbox Gearbox Crossmember Screws S...

Page 13: ...the Chassis Assembly The Gearbox tapers towards one end the thinner end has a groove into which the free end of the Driveshaft will fit Once correctly aligned push the gearbox into place Holding the...

Page 14: ...over so you are working on the underside of the Chassis Place the mounting lugs of the Crossmember into the holes on the Chassis Assembly Holding the Crossmember in position again carefully turn the c...

Page 15: ...HELBY SUPER SNAKE In this stage you will connect the Front Chassis to the Chassis Assembly Name Quantity Front Chassis 1 Screws TYPE MD06 5 inc 1 spare STAGE 27 PARTS LIST Front Chassis Screws Stage 2...

Page 16: ...r the Chassis Assembly as shown ensuring that the four rearmost raised lugs on the Front Chassis correspond the four frontmost mounting lugs on the Chassis Assembly Once in position press the Front Ch...

Page 17: ...17 AGORAMODELS SHELBY SUPER SNAKE Stage 27 Front Chassis Stage 27 complete...

Page 18: ...r Splash Guards to the Chassis Assembly Name Quantity Right Front Fender Splash Guard 1 Left Front Fender Splash Guard 1 Screws TYPE MD06 5 inc 1 spare STAGE 28 PARTS LIST Right Front Fender Splash Gu...

Page 19: ...ds next to the Chassis Assembly paying particular attention to their orientation The two eyelets on the back of each Splash Guard correspond with two mounting lugs on either side of the Chassis Assemb...

Page 20: ...teering Rods together to form the Tie Rod Assembly Name Quantity Left Tie Rod 1 Right Tie Rod 1 Center Link 1 Screws TYPE MD06 3 inc 1 spare Screws TYPE MD02 3 inc 1 spare STAGE 29 PARTS LIST Center L...

Page 21: ...an MD06 screw Tighten the screw until you feel resistance do not overtighten Check that the parts can move freely if they don t loosen the screw a little which is necessary for the steering to work co...

Page 22: ...22 AGORAMODELS SHELBY SUPER SNAKE Stage 29 Steering Rods Stage 29 complete...

Page 23: ...uspension Name Quantity Suspension Arm Mounts 2 Steering Gear 1 Pitman Arm 1 Screws TYPE MD06 3 inc 1 spare Screws TYPE MD02 2 inc 1 spare Screws TYPE MP01 2 inc 1 spare STAGE 30 PARTS LIST Steering G...

Page 24: ...mount place this in the opening in the Front Chassis Carefully turn the Chassis Assembly over and fix in place with an MD06 screw Once in place repeat the process with the other mount CON NECT THE ST...

Page 25: ...EP 3 Take the Tie Rod Assembly from the previous stage Locate the lug on the Center Link and place the narrow end of the opening on the Pitman Arm on this lug Secure it in place with an MD02 screw ti...

Reviews: