Eyesys Mini-B/A Gauge Controller
4
Mounting
Viton O-rings are recommended for KF fittings for most applications. For highly reactive or
corrosive applications, consult O-ring manufacturer.
Ensure adequate ventilation by making sure that there is approximately 1 inch (25 mm) of
free air space around the ventilation openings and that air flow is not blocked.
Mini-BA Tube Replacement Procedure
1. Loosen 5x #4 PHMS from front and rear of case (Figure 1).
Figure 1
Loosening 5x #4 PHMS from Front and Rear of Case
2. Remove top half of case assembly and place next to bottom case half assembly as
shown in Figure 2.
Top Case Half
Loosen 5x screws at slots
(do not remove)
3x near side
2x far side
Bottom Case Half
Summary of Contents for Eyesys Mini-B/A
Page 12: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 14: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 28: ...Eyesys Mini B A Gauge Controller 14 Table 8 Gas Correction Factors ...
Page 29: ...Eyesys Mini B A Gauge Controller 15 Table 7 Gas Correction Factors continued ...
Page 30: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 39: ...Returned Materials Report ...
Page 40: ......
Page 41: ......