Introduction
7-4
Agilent Technologies Representative Checklist
Prior to Installation
(Established Hospital Building)
___
Conference with Superintendent.
___
Establish site locations in building.
___
Establish number of bedside units and review the definitions
of Care Units, bed labels, tuning ranges.
___
Establish type of patient monitors at bedside and remote
areas.
___
Establish type of Information Center customization (alarms,
scales, and recording parameters, for example).
___
Plant engineer (or electrician)/architect aware of the number
of conduit runs.
___
Plant engineer/architect aware that he should call for
recommended conduit for all cable runs, that installation is
the responsibility of the hospital. Refer to table Table 8-1 on
page 8-10.
___
Plant engineer aware that hospital is responsible for
supplying and installing wall boxes—NEMA conduit switch
wall boxes with a minimum depth of 7cm (2 3/4 in.) with
conduit knockouts (such as RACO 560 or 562).
___
Outline dimensions and specifications given to plant
engineer/architect of recommended NEMA bedside switch
wall boxes (such as RACO 560 or 562).
___
Plant engineer/electrician aware that cable pulling is the
responsibility of the hospital and “pull boxes” are required
(local electrical code) at recommended intervals based on
number of conduit bends and cable length.
___
Plant engineer/electrician/architect aware that no other
wires should be run in the same conduit with signal cables.
___
Plant engineer aware that installation of Agilent Technologies
supplied wall mounts is the responsibility of the hospital.
___
Plant engineer/electrician/architect aware that AC power
diathermy cables, and so on should be run far enough away
from site to prevent interference—at least 0.3 m (1 ft.) away.
___
Plant engineer given dimension of the SDN Agilent CareNet
Controller (ACC).
___
Plant engineer aware that plywood panel must be mounted at
the ACC site location 40.6 cm high x 50.8 cm wide x 1.9 cm
deep (16 in. H x 20 in. W x 3/4 in. D) minimum, if unit is wall
mounted. If rack mounting, aware that 19"
telecommunications rack must be mounted.
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...