3
Installing Intuvo 9000 GC Columns
To Replace the 9000 GC/MS Tail
5977B Series MSD Operating Manual
69
4
Open the analyzer chamber. (See
“To Open the Analyzer Chamber”
5
If present, unscrew the knurled tip seal retainer and remove it, the interface
tip seal, and spring from the GC/MSD interface. (See
6
Ensure the MSD is properly aligned with the GC. If the GC and MSD are not
properly aligned, the transfer line clamp screw will be difficult to tighten.
7
Open the GC front door.
8
Open the bus door and remove it by lifting the door vertically off its hinge
pins.
9
Using the Intuvo torque driver, remove the compression bolt that secures the
9000 GC/MS Tail click and run bus connection. Also remove the bolt from the
empty bus connection. (See
10
Open the MS tail heater assembly by loosening the thumb screw at the top of
the clamp and rotating the clamp down.
11
Push the MS tail heater assembly back a few millimeters. A magnet will hold
the heater assembly away from the 9000 GC/MS Tail.
Figure 14.
MS tail heater assembly clamp closed
MS tail heater assembly clamp
Thumb screw
Compression bolts
Summary of Contents for 5977B CI MSD
Page 1: ...Agilent 5977B Series MSD Operating Manual ...
Page 12: ...12 5977B Series MSD Operating Manual ...
Page 34: ...1 Introduction To Replace the Primary Fuses 34 5977B Series MSD Operating Manual ...
Page 142: ...5 Operating in EI Mode To Pumpdown the MSD 142 5977B Series MSD Operating Manual ...
Page 252: ...8 CI Maintenance To Install the CI Source 252 5977B Series MSD Operating Manual ...
Page 253: ......