
36
30869 R8
Table 4
Install the 105'/125' Hydraulic Lift Cylinders (continued)
Item
Description
Quantity
12
1/2 x 1-3/4” bolt
8
13
1/2” locknut
10
14
Half clamp
2
Figure 9.
Installing the Lift Cylinders (105'/125')
6
8
9
6
5
11
11
13
10
1A
1B
14
14
13
12
13
7
7
2
2
4
3
3
4
4.8. Install the Track Shoe and Track Stop
1. Slide the track shoe onto the track.
2. Slide track shoe along full length of track to make sure there is no binding, and that track ends are properly
aligned where tube sections meet.
3. Attach the track stop using six 3/4” x 3” GR8 bolts, two track stop spacer plates, and six 3/4” locknuts.
Important
See
for track stop positions for specific auger models.
SWING-AWAY GRAIN AUGER – PORTABLE GRAIN AUGER