![AGCO HayBoss G2 600A1 Installation Manual Download Page 11](http://html1.mh-extra.com/html/agco/hayboss-g2-600a1/hayboss-g2-600a1_installation-manual_2866425011.webp)
11
Connecting the Harnesses to the DCP
– 600UHD1
1. Install the green capped terminating resistor (006-5650Z) to the Dual Channel Processor (DCP).
2. Route the communication harness (006-6650VAU) from the baler to the DCP. Attach the harness to the
whip harness coming off the base of the DCP. Secure harness from DCP to baler communication port.
3.
Install the baler’s black terminating resistor to the open end of the communication harness
(006-6650VAU) next to the DCP.
4. Remove cap from the 4 pin Deutsch connection located at the back of the baler.
5. Connect harness (006-6650VAU) 4 Pin Deutsch connection to baler connection at back of the baler for
power (LHR-C73).
6. Install the moisture harness (006-4640E2) into the DCP at the port marked Moisture Sensor. Secure
harness from DCP to star wheels.
Terminating resistor
006-5650Z
DCP
006-6671LS
Moisture harness
006-4640E2
Star wheels
030-4641U
6 Pin Delphi
Baler Connection
(LHR-C72 ISOBUS Term)
006-6650Z
Terminating Resistor
Comm. Harness
006-6650VAU
6 Pin Deutsch Baler Black
Terminating Resistor
006-6650AU
Power Harness
4 Pin Deutsch Power
(LHR-C73)