13.  Before unfolding boom remove transport wing lock 

 

pins (see figure 1) and tower cylinder Transport stop 

 

(see figure 2) Reinstall lock pins and tower stop 

 

before parking sprayer.

14.  Consult tractor manufacturers manual for hydraulic

 

operation system.(open or closed center system)

 

For closed center systems, leave hydraulic boom 

 

operation block located on the center of boom as

 

factory installed (see figure 4). For open center 

 

hydraulic systems, the by-pass (dump) valve needs

 

to be put back in th place of the by-pass (dump)

 

plug (see figure 3).

CONVERTING CLOSED CENTER TO

OPEN CENTER HYDRAULIC SYSTEM

*  Standing behind the center of the sprayer looking 

 

toward the tractor locate the boom folding hydraulic 

 

block . 

*  Locate the by-pass (dump) valve (see figure 4) on the

 

right hand side and the by-pass (dump) plug on left 

 

hand side.

*  Remove both plug and valve.

*  Reinstall by-pass valve on left hand side and 

 

plug on right hand side.

*  Plug in by-pass valve into 2 pin connector.

15.  Inspect boom alignment.

 

*  The boom is equipped with set bolt adjustments 

 

 

to provide a means to adjust alignment.

 

*  With the boom in field spraying position look down 

 

 

the sprayer boom from end to end and adjust 

 

 

alignment bolts as needed at each hinge.

 

*  6 points should be inspected annually.

 

*  Left and right inner boom (see figure 6)

 

*  Left and right outer boom (see figure 7)

 

*  Left and right break away (see figure 8)

To adjust, loosen jam nut, turn position bolt to the required posi-

tion and retighten jamnut.

FIG. 1

FIG. 2

FIG. 9

Summary of Contents for Schaben 8650 Series

Page 1: ...274 1025 NEWTON KS 7000 SCHABEN CT 67114 800 394 7662 BAKERSFIELD CA 4450 STATE RD 93308 877 724 2236 TEMPE AZ 8464 S KYRENE RD 85284 877 974 7166 OTHELLO WA 81 E PINE ST 99344 800 634 2026 HOPKINSVI...

Page 2: ...tight and that steel lines hoses and couplings are in good condition 17 Before applying pressure to chemical system make sure that all connections are tight and that all hoses and fittings are in good...

Page 3: ...the sprayer looking toward the tractor locate the boom folding hydraulic block Locate the by pass dump valve see figure 4 on the right hand side and the by pass dump plug on left hand side Remove both...

Page 4: ...FIG 4 FIG 3 OPEN CENTER SYSTEM CLOSED CENTER SYSTEM 3 8 6 5 0 S E R I E S S P R A Y E R S O P E R A T I O N M A I N T E N A N C E M A N U A L...

Page 5: ...low position prior to operating The boom circuit only requires 3 gpm of hydraulic flow Set hydraulic flow accordingly increasing hydraulic flow will not speed up boom function Only reduce sprayer pump...

Page 6: ...right outer boom in and down to extend Release the switch the right outer boom will stop moving and it will remain at that position 7 RIGHT BOOM EXTEND FOLD This spring loaded to neutral center switc...

Page 7: ...O M 6 3 Push down inner fold switches to unfold inner wings Note On 90 foot models extend outer booms before inner wings are completely unfolded Failure to do so can cause damage to outer boom section...

Page 8: ...ower to bottom position Open Inductor activation valve valve 8 to start venturi vacuum Add pre determined chemical amount to inductor tank and then open inductor tank valve valve 9 to allow chemical t...

Page 9: ...as needed when changing chemicals NOTE Recommendation that a chemical neutralizer be run threw the rinse system between different chemical usages Follow procedures stated above Rinse with water follow...

Page 10: ...be folded flat against the tongue when in transport or field operation see figure 18 FIG 18 FIG 19 OPTIONAL SPRAY CONTROLLER SPEED SENSOR 1 Start hyrdraulic pump and make sure you have at least 70 P...

Page 11: ...A G S P R A Y C O M 1 0 FIG 10 FIG 20 1 Quick Fill For Main Tank 2 Quick Fill For Flush Tank 3 Quick Fill For Handwash Tank QUICK FILL FIG 11 2 3 1 1 2 1...

Page 12: ...engine turn monitor off set park brake remove ignition key wait for nozzles to stop spraying before servicing adjusting repairing or unplugging 3 Follow good shop practices Keep service area clean and...

Page 13: ...emove and clean thoroughly Also clean lubricant passageway Replace fitting if necessary Note Grease 19 points 8 hours or daily L R GREASE LOCATIONS 1 L R Breakaway Hinge 2 L R Outer Boom Hinge 3 L R I...

Page 14: ...close Each motorized ball red wire connects to the 12V terminal Each motorized ball valve black wire will connect to ground terminal and each motorized ball valve white wire will connect to the corre...

Page 15: ...e all valves several times Flush water through the booms 6 Repeat step 5 7 Calibrate the pump nozzles and sprayer before using 8 Go through the pre field checklist before using Ag Spray Equipment warr...

Page 16: ...Z 8464 S KYRENE RD 85284 877 974 7166 P 480 705 8047 F 480 705 8048 TEMPE AGSPRAY COM OTHELLO WA 81 E PINE ST 99344 800 634 2026 P 509 488 6631 F 509 488 2927 OTHELLO AGSPRAY COM HOPKINSVILLE KY 1100...

Reviews: