![AFRISO 42421 Operating Instructions Manual Download Page 26](http://html.mh-extra.com/html/afriso/42421/42421_operating-instructions-manual_2864773026.webp)
9
Mounting
EN
MSW
5
Mounting
Only mount the product after having completed all pipe assembly work, all
welding work and all soldering work.
1. Flush the lines of the system before installing the product.
5.1
Preparing mounting
NOTICE
LEAKING PRODUCT
•
Verify that the pipe of the product has been thoroughly flushed prior to instal-
lation. Impurities and deposits such as weld beads, hemp, metal chips or
limescale cause leaks of the product.
Failure to follow these instructions can result in equipment damage.
Verify that the nominal pressure of the product corresponds to the speci-
fication value of the system.
Verify that the liquid in the system complies with the intended use.
Verify that liquid can escape via the discharge line during heating up.
Verify that the product has been mounted without a shut-off element.
- Do not install shut-off valves, filters or similar equipment.
Verify that the product is mounted in such a way that no external forces
can act on the components after it has been installed.
Summary of Contents for 42421
Page 17: ...16 Anhang DE MSW 14 Anhang 14 1 EU Konformitätserklärung ...
Page 33: ...16 Appendix EN MSW 14 Appendix 14 1 EU Declaration of Conformity ...
Page 49: ...16 Annexe FR MSW 14 Annexe 14 1 Déclaration de conformité UE ...
Page 65: ...16 Aneks PL 14 Aneks 14 1 Deklaracja zgodności UE ...
Page 81: ...16 Anexă RO MSW 14 Anexă 14 1 Declarație de conformitate UE ...