8.Specifications

Specifications

21

Max. DC Power ( W )
Max. DC Voltage ( V )
MPPT Voltage Range ( V )
MPPT Full Power Voltage Range ( V )
Rated Input Voltage ( V )
Start-up Voltage ( V )
Max. Input Current ( A )
Max. Short Current ( A )
No. of MPP Tracker / 

No. of PV String
Input Connector Type

Max. Output Power ( W )
Nominal Output Power ( W )
Max. Output Current ( A )
Nominal Output Voltage ( V )
Grid Voltage Range
Nominal Output Frequency ( Hz )
Grid Frequency Range
Output Power Factor
Output Current THD

Max. Efficiency
Euro Efficiency

PV Input Data

AC Output Data

E

ciency

Protec

on

General Data

Cer�fica�ons and Standards

°C

180Vac-276Vac (According to local standard)

45~55Hz/54~66Hz (According to local standard)

1 default (adjustable from 0.8 leading to 0.8 lagging)

L/N/PE, 220Vac, 230Vac, 240Vac

Integrated (Type III)

RS485 / WiFi / Wire Ethernet / GPRS (op

onal)

EN/IEC 61000-6-2, EN/IEC 61000-6-3, EN61000-3-2, EN61000-3-3, EN61000-3-11, EN61000-3-12

  EN/IEC 62109-1/-2 ,UL1547, IEC 60068-2

EN50549-1, EN50438, RD 1699,UNE 217001, RD 413, IEC61727, IEC62116, IEC61683, VDE4105, 

UL1741 VDE0126  AS4777.2 NB/T 32004-2013, UNT C 15-712-1, ABNT NBR 16149, ABNT NBR 16150

PV Reverse Polarity Protec�on
PV Insula�on Resistance Detec�on
AC Short Circuit Protec�on
AC Over Current Protec�on
AC Over Voltage Protec�on
An�-Islanding Protec�on
Residual Current Detec�on
Over Temperature Protec�on

Integrated DC switch

Surge Protec�on 

Dimensions (W x H x D, mm)
Weight ( kg )

Protec�on Degree

Enclosure Material
Ambient Temperature Range (     )
Humidity Range
Topology

Communica�on Interface

Cooling Concept
Noise Emission ( db )

Night Power Consump�on ( W )
Max. Opera�on Al�tude

 ( m )

EMC Standard
Safety Standard

Grid-connec

on

HNS3000TL

360

70

14 x 2
18 x 2

2/2

3300
3000

15

98.20%
97.80%

YES
YES
YES
YES
YES
YES
YES

4500

600

70-550

110-550

MC4

HNS3600TL

360

70

14 x 2
18 x 2

2/2

3960
3600

16

98.20%
97.82%

YES
YES
YES
YES
YES
YES
YES

4000

5400

600

70-550

130-550

MC4

HNS4000TL

360

70

14 x 2
18 x 2

2/2

4400
4000

20

98.20%
97.85%

YES
YES
YES
YES
YES
YES
YES

13

<28

<40

344 x 297 x 166

6000

600

70-550

145-550

MC4

HNS5000TL

360

70

14 x 2
18 x 2

2/2

5500
5000

23

<3%

50/60

98.20%
97.90%

YES
YES
YES
YES
YES
YES
YES

Convec�on

<1

IP65

Aluminum

-25~+60

Transformerless

0-100%

7000

600

70-550

180-550

MC4

HNS6000TL

360

70

14 x 2
18 x 2

2/2

6600
6000

27

98.20%
97.92%

YES
YES
YES
YES
YES
YES
YES

8400

600

70-550

220-550

MC4

HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL

HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL

HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL

HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL

HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

3960
3600

18

98.20%
97.80%

HNS3600TL-1

HNS3600TL-1

HNS3600TL-1

HNS3600TL-1

HNS3600TL-1

HNS3600TL-1

360

50

22

27.5

1/1

4200

550

50-500

260-500

MC4

YES
YES
YES
YES
YES
YES
YES
YES
YES

Summary of Contents for HNS3000TL

Page 1: ...Installation and Operation Manual On Grid PV Inverter ...

Page 2: ...ter 3 5 Electrical Connection 3 5 1 PV Connection 3 5 2 Grid Connection 3 5 3 Communication Connection WIFI Ethernet GPRS RS485 4 Operation 4 1 Control Panel 4 2 Menu Structure 4 3 Setting 4 3 1 Startup Setting 4 3 2 Parameter Setting 5 Commissioning 6 Shut Down Restart the Inverter 6 1 Shut Down Procedures 6 2 Restart the inverter 7 Maintenance Trouble Shooting 7 1 Maintenance 7 2 Fault Code and ...

Page 3: ...ersonnel Single Phase Two MPPT Trackers HNS3000TL HNS3600TL HNS4000TL HNS5000TL HNS6000TL Single Phase One MPPT Tracker HNS3600TL 1 Please keep this manual all the time available in case of emergency About This Manual 01 The typical connection diagram for the entire PV system is on grid CircuitBreaker 1 SurgeProtective Device DCA1 DCA1 PE WIFI RS485 Cloud server Portal web Porta Smart phone PVA1 P...

Page 4: ...e Protector Recommendation SPD Lightning protection system refer to the following options AC side nominal discharge current 20KA second grade lightning protection protection voltage 2 5KV DC side nominal discharge current 20KA second grade lightning protection protection voltage 3 2KV The wiring distance between the inverter and the distribution box should be at least 5 meters Single Phase Two MPP...

Page 5: ... during installation operation and maintenance Safety Symbols 03 2 2 Explanations of Symbols Do not dispose of this device with the normal domestic waste Without Transformer This inverter does not use transformer for the isolation function CE mark The inverter complies with the requirements of the applicable CE guidelines Refer to manual before service Danger of Electric Shock The inverter contain...

Page 6: ...4 5 6 7 1 1 1 1 1 1 1 Solar Inverter Certificate Of Inspection Quick Installation Instructions Warranty Card Wall Mounting bracket 8 9 10 11 12 13 3 3 1 1 1 2 1 Plastic Expansion Tube Mounting Bracket Screw Security Screw Screwdriver for Security Screw DC Connector sets Zero Injection Connector Optional Qty Items No Qty Items 6 2 3 4 5 1 7 8 9 10 11 12 13 MC STOP MC Certificate Of Inspection Quick...

Page 7: ...e individual connection areas on the bottom of the inverter Installation 05 3 2 Product Overview No 1 2 3 4 5 6 DC Switch DC Connectors For PV Strings DC Connectors For PV Strings AC Connector Monitor Module Port Zero Injection Port Optional Items 344 mm 297 mm 166 mm 1 2 3 4 5 6 ...

Page 8: ...e or corrosion materials where is suitable for inverter s weight and dimensions The ambient temperature should be within 25 60 between 13 F and 140 F The installation of inverter should be protected under shelter Do not expose the inverter to direct sunlight water rain snow spray lightning etc Installation 06 3 3 Mounting Location The inverter should be installed vertically on the wall or lean bac...

Page 9: ...on 07 3 4 Installation On grid PV Inverter Leave the enough space around inverter easy for accessing to the inverter connection points and maintenance Step 1 Step 2 328 5mm 26mm 26mm 35mm 300mm 100mm 100mm 500mm ...

Page 10: ...ing must not exceed inverter s range The isolation resistance between PV string and ground must exceed 10 kΩ The polarity from PV strings are correct Use the DC plugs in the accessory The lightning protector should be equipped between PV strings and inverter Disconnect all of the PV DC switch during wiring 3 5 1 PV Connection Warning The fatal high voltage may on the DC side please comply with ele...

Page 11: ...mm 2 Cross section 4 mm Step 3 Note It is strongly recommended to connect by two strings of panels for models of two MPPT channels e g HNS3000 6000TL Note PV cable suggestion Note Please use PV connector crimper MC STOP MC Note You ll hear click sound when the connector assembly is correct ...

Page 12: ...n box are correctly connected Use the AC plugs in the accessory The surge protector should be equipped between grid and inverter Disconnect the AC grid switch during wiring Installation 10 3 5 2 Grid Connection Warning The fatal high voltage may on the AC side please comply with electric safety when connecting Please make sure the right line of AC grid connected with inverter otherwise inverter co...

Page 13: ...e L Neutral line N and Ground Wire PE according to polarity Step 3 Connect AC terminals and waterproof head tighten the cap make sure they clip closely together Connect AC connector to AC terminal of the inverter Ensure firm insertion Step 4 ...

Page 14: ...oud server and display the data on the PC tablet and smart phone Wi Fi GPRS RS485 communication is applicable to the inverter Please refer to Communication Configuration Instruction for detailed instruction Install the Wi Fi GPRS RS485 Communication 3 5 3 Communication Connection Fasten ...

Page 15: ...f home electricity the inverter will active export power limit function based on the monitoring data Please refer to Zero injection Smart Meter Instruction for detailed instruction Step 1 Step 2 Afore Smart Meter Afore Smart Meter 5 6 24 25 1 2 3 8 PIN Assignment RS485 A PIN 24 RS485B PIN 25 Zero Injection Port pin assignment 12345678 RJ45 Plug ...

Page 16: ...xceed Smart Mater s limitation Grid Load RS485 WiFi Ethernet GPRS Router Cloud Server Weather Sta on Afore Smart Meter PV Inverter PV Array Energy Meter PV Inverter PV Array PV Inverter PV Array I It te em ms s N No o I It te em ms s N No o 1 2 3 4 LCD Display ESC Touch Button UP Touch Button DOWN Touch Button 5 6 FAULT LED Indicator GRID LED Indicator ENT Touch Button POWER LED Indicator ...

Page 17: ... Uersion M xxxx Version S xxxx Version S xxxx S N Machine Sxxxxxxxxx First Level Menu Second Level Menu Wifi Info IP Wifi 192 168 xx xx S N Wifi xxxxxxxxxx Error Record No Error Date Time Time H M S Date Year month day Set PassWord xxxx Upstream PassWord xxxx ...

Page 18: ...Day Time Date Dd Mm 2015 Time Hh Mm Ss Waiting Xx Power XXW CY China Set Eng1G83 Nouns Explanation Inverter Info Display the serial number and firmware version of inverter Check the error list of inverter including date and time Display the WIFI serial number and assigned IP address Set date and time of the inverter Countercurrent Set the protection parameters of inverter Error Record WiFi Info Da...

Page 19: ...ET Enter Enter Enter Enter Enter Enter Input Password Para Adj Para XXX Power Off and Restart Inverter Finish Para View Max VoLtage XXX Min VoLtage XXX Max FrEquency XXX Min FrEquency XXX Safety XXX Note The inverter need to be restarted to finish parameter setting ...

Page 20: ...rdingly to local standards or regulations Commissioning Procedures Turn on the AC switch between inverter output and the public grid Turn on the DC switch on the inverter Turn on the PV switch of the system 5 Commissioning DOWN ENT UP ESC POWER FAULT GRID FAULT Red LED Green LED Green LED POWER GRID LED Indication Sign Color Explanation GRID Green On Off On Off On Off Green Red FAULT Inverter is f...

Page 21: ...uble shooting list to solve the problem Turn off the DC switch on the inverter Turn off the PV switch of the system Turn off the AC switch between inverter output and the public grid Follow the procedures below when the inverter needs to be restarted Follow the Shut Down Procedures of Article 6 to shut down inverter Follow the Commissioning Procedures of Article 5 to turn on the inverter 7 Mainten...

Page 22: ...re down to the normal Or install the inverter at a well ventilated site replace the temperature sensor PV Over Fault PV input voltage high PV array s Voc high re design the PV array configuration measure the PV array voltage is the same as inverter displayed M Grid Volt Fault Grid voltage out of range grid voltage out of the setting range grid back to the normal the inverter will restart automatic...

Page 23: ... Temperature Protec on Integrated DC switch Surge Protec on Dimensions W x H x D mm Weight kg Protec on Degree Enclosure Material Ambient Temperature Range Humidity Range Topology Communica on Interface Cooling Concept Noise Emission db Night Power Consump on W Max Opera on Al tude m EMC Standard Safety Standard Grid connec on HNS3000TL 360 70 14 x 2 18 x 2 2 2 3300 3000 15 98 20 97 80 YES YES YES...