Commissioning
18
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
· Mounting location is meet the requirements.
· All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
· The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
· Turn on the AC switch between inverter output and the public grid;
· Turn on the DC switch on the inverter;
· Turn on the PV switch of the system.
5.Commissioning
DOWN
ENT
UP
ESC
POWER
FAULT
GRID
FAULT
Red LED
Green LED
Green LED
POWER
GRID
LED Indication
Sign
Color
Explanation
GRID
Green
On
Off
On
Off
On
Off
Green
Red
FAULT
Inverter is feeding power
Inverter is not feeding power at the moment
Power On
No Power
Fault occurred
No fault
POWER
Power